All In For Battery Based Energy Storage- Saurabh Kumar, GEAPP Updated On Mon, Jul 1st, 2024 by Saurenergy For India’s energy sector, the impact Saurabh Kumar has been well documented. Currently, the Vice President-India, GEAPP (Global Energy Alliance for People and Planet) Kumar is well known for being the man behind the LED revolution in the country, which he initiated during his stints as the key founder of the public sector Bureau of […] Read more
Growatt Unveils Energy Storage Solutions In Europe Updated On Thu, Jun 27th, 2024 by Saurenergy Growatt, showcased its latest extensive offerings at Intersolar Europe 2024, held from June 19th to 21st in Munich. The company’s exhibit prominently featured innovative products designed to meet the growing global demand for energy storage, alongside cutting-edge solutions for solar PV systems, EV charging, portable power stations, and smart energy management. “With the global focus […] Read more
Waaree Secures Module Supply Contract For Acciona Energy’s Subsidiary Juna Updated On Mon, Jun 24th, 2024 by Saurenergy Indian solar module manufacturer Waaree Energies has been awarded a major contract by Acciona Energy’s subsidiary Juna Renewable Energy Private Limited, to supply its bifacial solar modules for the 412.5 MWp/335 MW AC project in Rajasthan. The date of commissioning of the said project is in March 2025. The project, located in Kawani village, Bikaner […] Read more
India’s Main Opposition Attacks A Modi Govt. Policy With Data And (Some) Science Updated On Mon, Jun 24th, 2024 by Saurenergy For the last 10 years, India’s BJP run government’s renewable plans have gone mainly uncontested in the elections, in part due to the opposition parties’ distraction with other issues. Thus, after a better than expected show in the 2024 elections, it is good to see the main opposition, the Congress party finally do its job […] Read more
Govt’s New Scheme To Aid In Evacuating RE From Rajasthan, Karnataka Updated On Mon, Jun 24th, 2024 by Saurenergy The Union government has now approved new Inter-State Transmission System (ISTS) schemes to evacuate 9 Gigawatt (GW) of renewable energy (RE) from the renewable rich states of Rajasthan and Karnataka. These schemes will be implemented through Tariff-Based Competitive Bidding (TBCB) mode. These schemes are part of the government’s 500 GW renewable energy capacity by 2030 […] Read more
Technician- Maintenance Updated On Fri, Jun 21st, 2024 by Saurenergy Responsible for installing, troubleshooting (Emergency Repair) and maintaining of production tools in the lines. This includes Preventive, Predictive & Repair Maintenance activities for all manufacturing production tools such as electrical systems, motors, vacuum pumps, conveyors, Robots, and material handling machines. Ensure assigned PM – Job Plans and Work Orders from CMMS system are carried out […] Read more
Lead- Warehouse Operations and Materials Updated On Fri, Jun 21st, 2024 by Saurenergy Develops a globally aligned warehouse strategy for the site to drive a lean, efficient warehouse covering BOM, Spares, Consumables and Finished Goods. This includes driving an efficient and effective distributions of parts mentioned above between sites, which is cost effective. Responsible for the overall performance of the warehouse and inventory control functions; includes FG shipments, […] Read more
Smarter E AWARD – Photovoltaics Category 2024 Winners Announced Updated On Fri, Jun 21st, 2024 by Saurenergy The Smarter E AWARD 2024 has been announced, celebrating a new set of winners who are transforming the dynamics of energy and mobility through their innovative products and solutions. The Smarter E AWARD seeks to honour concepts and technologies that contribute to a 24/7 renewable energy supply. The award encompasses five categories: Photovoltaics, Energy Storage, […] Read more
NTPC-VVN Invites Bids For 250 MW/500MWh Standalone BESS Project Updated On Fri, Jun 21st, 2024 by Saurenergy NTPC Vidyut Vyapar Nigam Limited (NTPC-VVN), a Central Public Center Enterprise released a tender inviting bids for setting up 250 MW/500MWh Standalone Battery Energy Storage Systems (BESS) in India. NTPC VVN invited bids for the selection of battery energy storage system (BESS) developers for setting up 500 MWh (250 MW x 2 hrs) standalone Battery […] Read more