AGEL Arm Wins Compensation Claim From CERC For Rajasthan Wind Solar Hybrid Project Updated On Fri, May 3rd, 2024 by Saurenergy In a petition brought forward as the developer of a 450 MW ISTS connected Wind-Solar Hybrid power project, entered between Adani Solar Energy Jaisalmer One Private Limited (formerly known as SBE Renewables Ten Projects Private Limited) and Solar Energy Corporation of India Limited seeking Change in Law compensation along with Carrying Cost, the CERC had […] Read more
SJVN Invites Bids For 1200 MW Solar Power Projects Across India Updated On Thu, May 2nd, 2024 by Saurenergy Hydro, and now, all renewable focused PSU SJVN Limited has invited proposals for selection of solar power developers. The company released a tender for setting up of 1200 MW ISTS-connected solar power projects anywhere in India under tariff-based competitive bidding, on build-own-operate (BOO) basis. SJVN is expected to enter into a Power Purchase Agreement (PPA) […] Read more
Production Head – Solar Cell Manufacturing Updated On Wed, May 1st, 2024 by Saurenergy Role & Responsibilities:- Preferably knowledge of existing and emerging cell technology like PERC, TOPCON, HJT. · Responsible for Proper Manpower Planning in Cell Line area for smooth and safe operation. · Responsible for maintaining discipline in chemical handling/draining / treatment · Leading role along with Process/quality department for implementing new/Improved process · Responsible for meeting […] Read more
FY24: REC Ltd Reports 125% Jump In Sanctions For Solar Projects Updated On Tue, Apr 30th, 2024 by Saurenergy REC Limited, a Maharatna Central Public Sector Enterprise (CPSE) today presented its audited standalone and consolidated financial results for the quarter ended March 31, 2024 and FY24. REC Limited comes under the Ministry of Power. As per the details shared by REC Limited, it recorded its highest-ever annual profit. The media release from the company […] Read more
NTPC-REL Releases Tender For 260 MW Solar Project At Bikaner Updated On Tue, Apr 30th, 2024 by Saurenergy NTPC Renewable Energy Limited (NTPC REL), a subsidiary of NTPC released a tender, inviting online bids from eligible bidders for the development of a 260 MW grid-connected solar PV project at Bikaner, Rajasthan. NTPC REL invited bids for design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading storage, installation, testing and commissioning of the solar […] Read more
NHPC Collaborates With Norwegian Firm To Develop Floating Solar Updated On Tue, Apr 30th, 2024 by Saurenergy NHPC recently signed a Memorandum of Understanding (MoU) with a Norway-based company Ocean Sun. Through this collaboration, the Norwegian technology provider would support India in building floating solar projects. In a social media post, the company announced it would explore key areas of cooperation for the demonstration of Ocean Sun’s floating solar energy technology. The […] Read more
SaurEnergy Explains- AC & DC Capacity of Solar Projects Updated On Fri, Apr 26th, 2024 by Saurenergy As Solar PV penetration hits new highs each year, the numbers are just adding up. 2023 saw at least 29 countries installing more than 1 GW, up from 25 countries in 2022. Nineteen countries (not including the EU) now have more than 10 GW of total cumulative capacity and five have more than 40 GW. […] Read more
IEA Forecasts 40% Drop In Battery Storage Costs By 2030 Updated On Fri, Apr 26th, 2024 by Saurenergy International Energy Agency’s (IEA) recent report on the use of batteries in electric vehicles (EVs) and battery storage installations has shown that developer costs of batteries will decline by 40% by 2030. The report was prepared after studying the use of solar PV plus batteries and found the total upfront costs of utility-scale battery storage […] Read more
BREDA Invites Bids For 200 MW Rooftop Solar Project Across Govt. Buildings In Bihar Updated On Fri, Apr 26th, 2024 by Saurenergy Bihar Renewable Energy Development Agency, (BREDA) has released a tender for grid – connected rooftop solar power plants of various capacity. This project was released under CAPEX model for an estimated capacity of 200 MW at various government buildings in the state of Bihar. BREDA’s tender invited bids through national competitive bidding process (NCB). It […] Read more