Iberdrola Signs PPA For 52 MW Wind Power in USA Updated On Tue, May 28th, 2019 by Saurenergy Iberdrola group, through its subsidiary in the USA, Avangrid Renewables, has signed a PPA (Power Purchase Agreement) with Dairyland Power Cooperative to supply 52 MW of renewable energy from the Tatanka Ridge wind farm in South Dakota. Dairyland’s portion of Tatanka Ridge’s output would represent enough wind power to power approximately 16,000 homes. Avangrid Renewables […] Read more
SECI Extends Tender For Floating Solar Plus BESS at Lakshadweep Updated On Tue, May 28th, 2019 by Saurenergy SECI has extended the tender deadline from June 3, 2019, to August 5, 2019. The Solar Energy Corporation of India (SECI) extends the tender deadline setting up of 20 MW floating solar PV power plants with associated 60 MWh Battery Energy Storage System (BESS) at Lakshadweep again. The last date for bid submission has been […] Read more
Adani Solar Aiming For 50% Market Share by 2021 Updated On Mon, May 27th, 2019 by Saurenergy Adani Solar, the solar manufacturing arm of the Adani Group has set sights for acquiring 50 percent market share in the next two years, a top company official has confirmed. “As 80 percent of solar panels available in the country are made in China, the company is manufacturing module and panels, which were cheaper and durable, […] Read more
Pharma Major Cipla Acquires 26 Percent Stake in AMPSolar Owned Local SPV Updated On Mon, May 27th, 2019 by Saurenergy The acquisition is expected to be completed by June 12, 2019. Cipla has invested Rs 12.9 crore for the 26 percent stake in the SPV. Indian multinational pharmaceutical and biotechnology company, Cipla, has announced the acquisition of a 26 percent minority stake in AMPSolar Power Systems Pvt. Ltd. (AMPSolar), a wholly owned subsidiary of AMPSolar […] Read more
AAI Floats Tender For O&M of 300 kW Solar Plant in Allahabad Updated On Mon, May 27th, 2019 by Saurenergy The last date of bid submission is June 4, 2019. The Airports Authority of India (AAI) has issued a tender, seeking bids from eligible bidders for performing the operation and maintenance services for its 300 kW solar PV power plant at CATC Allahabad. The scope of work for the selected agency will include the operation […] Read more
Canadian Solar Modules Light-up Medical Center in a Country with 5% Electrification Updated On Sat, May 25th, 2019 by Saurenergy This is how the use of solar can provide greatly needed electricity in a country like Sierra Leone which is having just 1 per cent electrification rate in rural areas. With an aim to support in a social cause for the society, solar PV modules maker Canadian Solar has donated its MaxPower CS6U-P 330W solar modules […] Read more
BHEL Floats Tender For Surveying & Investigation Works For 2 Solar Plants in Gujarat Updated On Fri, May 24th, 2019 by Saurenergy The last date for bid submission is June 10, 2019 Bharat Heavy Electricals Ltd (BHEL) has issued a tender, seeking bids from eligible parties for conducting a topological survey and soil investigation works for two solar power projects in the state of Gujarat. The two project sites are the 75 MW solar PV plant for […] Read more
EVs, Batteries Can Drive Solar Rooftop Growth, Says Report Updated On Fri, May 24th, 2019 by Saurenergy In order to boost the growth of renewable energy including solar rooftop, the dropping costs of electric vehicles (EVs) and batteries with equal grid market access can be helpful, says the report released by the Institute for Energy Economics and Financial Analysis (IEEFA). This ‘Electric Vehicles and Batteries Can Drive Growth of Residential Solar’ report […] Read more
Solar Prosumers in Goa Get Faulty Bills, Still Awaits Subsidy Payment Updated On Fri, May 24th, 2019 by Saurenergy After spending lakhs of rupees on rooftop solar installations, solar prosumers (producers and consumers of solar power) are now distressed as the electricity department failed to account for the solar power that their plants have been supplying to the grid. Receiving their first bills after a period of six months since their solar installations were […] Read more