Why Solis Inverters became the Preferred Choice of Airports PV Power Station at Home and Abroad Updated On Sat, Aug 24th, 2019 by Saurenergy Efficient and convenient air traffic is one of the prerequisites for the development of modern society and economy, especially for the development of high-tech industry. In addition to its own benefits, the civil aviation transportation industry has obvious comprehensive benefits in promoting the development of resources, producing “airport economic zone”, promoting the development of regional […] Read more
Waaree Energies Ships 2.5 GW of Solar Modules Globally Updated On Fri, Aug 23rd, 2019 by Saurenergy Manufactures 4 MW of solar panels per day. Waaree Energies, India’s largest solar panel manufacturer and a leader in the EPC, has recently cemented its position as the largest module supplier in India. Having a whopping annual production capacity of 1.5 GW, Waaree manufactures 4 MW solar modules every day. They have already supplied almost […] Read more
Maharashtra Tenders for 3.6 MW Solar Plants at Various Water Treatment Plants Updated On Fri, Aug 23rd, 2019 by Saurenergy MEDA has issued a tender for 3.6 MW solar PV systems to be installed at various existing water lifting and water plants in Maharashtra under RESCO model. The Maharashtra Energy Development Agency (MEDA) has issued a tender for the implementation of cumulative capacity of 3.658 MW grid-connected rooftop/ ground-mounted solar PV systems to be installed […] Read more
Cost of Renewables in China to Match Coal Power by 2026: Report Updated On Thu, Aug 22nd, 2019 by Saurenergy According to new research, the cost of renewables is already cheaper than gas-fired power in China, and will match and better coal power by 2026 As China moves towards a subsidy-free era for wind and solar projects beginning in 2021, the economics of renewable power have come into the spotlight. According to new research China provincial […] Read more
MNRE Issues Guidelines for Phase-II of 40 GW Rooftop Solar Programme Updated On Wed, Aug 21st, 2019 by Saurenergy MNRE has issued the implementation guidelines for the second phase of the 40 GW Rooftop Solar Programme, with the focus this time on Discoms for better execution The Government of India (MNRE) has set the target of achieving 100 GW of solar power capacity in the country by the year 2022 of which 40 GW […] Read more
Okaya Power Unveils New Range of Lithium E-Rickshaw Battery Updated On Wed, Aug 21st, 2019 by Saurenergy As part of its limited period introductory inaugural offer, the company is offering its customers lithium battery charger worth Rs 10,500 for free with each lithium e-Rickshaw battery unit till stock lasts. Okaya Power Pvt Ltd, an arm of Rs 7 billion Okaya Power Group, has launched a new range of Okaya Lithium e-Rickshaw battery, […] Read more
Gujarat Issues Tender for Solar Projects Worth 1 MW at Tourist Locations Updated On Wed, Aug 21st, 2019 by Saurenergy The Tourist Corporation of Gujarat has issued a tender for setting up of on-grid solar systems, solar parking lots, and off-grid solar benches at various smart tourist locations in the state. The Tourist Corporation of Gujarat Ltd. (TCGL) has issued a tender, inviting bids from eligible parties for setting up of on-grid solar systems, solar […] Read more
WBPCB Tenders for 50 Rooftop Solar Systems Worth 500 kW Updated On Tue, Aug 20th, 2019 by Saurenergy WBPCB has issued a tender for the installation of 50 rooftop solar systems each of array capacity 10 kWp in the state. The West Bengal Pollution Control Board (WBPCB) has issued a tender for the installation of 50 grid-connected rooftop solar power plants each of array capacity 10 kWp on turnkey basis at various locations […] Read more
NTPC Planning 5 GW Solar Park in Kutch Worth Rs 20,000 cr Updated On Tue, Aug 20th, 2019 by Saurenergy NTPC is planning to set up an ultra-mega solar park in the Kutch region of Gujarat with an estimated capacity closing on 5 GW State-owned power utility NTPC Ltd. has announced that it is planning to set up an ultra-mega solar park in the Kutch region of Gujarat with an estimated capacity closing on 5 GW with an […] Read more