Greenko, ReNew Power win SECI’s 1.2 GW Hybrid Plus Storage Tender Updated On Sat, Feb 1st, 2020 by Saurenergy Greenko Group and ReNew Power have won with their bids in SECI’s 1.2 GW wind-solar hybrid projects with energy storage tender and peak power supply. The Greenko Group and ReNew Power have won with their bids in the Solar Energy Corporation of India’s (SECI) 1.2 GW wind-solar hybrid power projects with energy storage tender and […] Read more
Budget 2020: Solar Industry Seeks Policy Reforms for Ease of Doing Biz Updated On Fri, Jan 31st, 2020 by Saurenergy With the release of the Economic Survey 2020 today, by the Chief Economic Adviser Krishnamurthy V Subramanian, which is the reflection of the Modi 2.0 government’s annual report card, all eyes are on the Finance Minister Nirmala Sitharaman’s Budget 2020 presentation on February 01, 2020. In Budget this year, Finance Minister Sitharaman is likely to […] Read more
BHEL Tenders for O&M of 1.7 MW Solar Plant in MP Updated On Fri, Jan 31st, 2020 by Saurenergy BHEL has issued a tender for undertaking the O&M of a 1.7 MW solar power plant in Bina, Madhya Pradesh. Bharat Heavy Electricals Limited (BHEL) has issued a tender, inviting bids from eligible vendors for undertaking the operation and maintenance (O&M) of a 1.7 MW solar power plant in Bina, Madhya Pradesh. The scope of […] Read more
EVs to Cost Less Than ICE Vehicles Inside 3 Years: Niti Aayog CEO Updated On Fri, Jan 31st, 2020 by Saurenergy EVs will cost less than ICE vehicles in 3 years as the price of battery packs is expected to fall by almost 51% per unit, NITI Aayog CEO Amitabh Kant said Electric Vehicles (EVs) will become cheaper than internal combustion engine (ICE) vehicles in three years as the price of battery packs of EVs is […] Read more
MNRE Offers Clarification on Phase II of Rooftop Solar Programme Updated On Thu, Jan 30th, 2020 by Saurenergy MNRE which has been implementing Phase II of the rooftop solar programme has issued a new clarification regarding the CFA and empanelment of the bidders. The Ministry of New and Renewable Energy (MNRE) which has been implementing Phase II of the grid-connected rooftop solar programme has issued a new clarification regarding the CFA and empanelment […] Read more
Tender for 5 MW Solar Plant on RESCO Model Issued in Noida Updated On Thu, Jan 30th, 2020 by Saurenergy The New Okhla Industrial Development Authority has issued a tender for the commissioning of 5 MW solar PV plant on the RESCO model in Noida The New Okhla Industrial Development Authority (NOIDA) has issued a tender for the commissioning of a 5 MW grid-connected solar PV plant under the RESCO model at identified buildings/ spaces […] Read more
Madhya Pradesh Tenders for Rooftop Solar Projects With Storage Systems Updated On Thu, Jan 30th, 2020 by Saurenergy MPUVNL has issued an RfP for the commissioning of grid-connected and off-grid rooftop solar projects in Madhya Pradesh along with Battery Storage The Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) has issued a request for proposal (RfP) for the selection of contractors for the commissioning of grid-connected and off-grid rooftop solar projects in the state. […] Read more
As Cancellations Surge, India’s Solar ‘Pipeline’ Drying Up Updated On Thu, Jan 30th, 2020 by Saurenergy News from the much celebrated 2 GW auction of NTPC in 2018, where top developers had bid for prices as low as Rs 2.59 is not good. 70 percent of the capacity won by developers, namely, Acme Solar, Shapoorji Pallonji, and Azure Power, have opted out of the deal, citing regulatory delays. The option of […] Read more
Limited CERC Relief For Avaada, Canadian Solar in GST Dispute with SECI Updated On Wed, Jan 29th, 2020 by Saurenergy In a detailed order with far reaching implications for multiple cases related to the same issue, the Central Electricity Regulatory Comission (CERC) has provided limited relief to Avaada Power Private Limited and Canadian Solar Holdings on their GST related claims. The pricipal issue for both firms was that the enactment of the GST law was […] Read more