As Govt Reimposes ALMM, New Challenges Emerge For Solar Industry Updated On Mon, Apr 8th, 2024 by Saurenergy Approved List of Module Manufacturers (ALMM) reimposition in India by the Ministry of New and Renewable Energy (MNRE) has led to speculations in the solar industry ranging from solar module manufacturers, and developers to other stakeholders. The ministry had earlier kept it in abysence for a few years to allow the domestic solar market to […] Read more
SJVN Invites Bids For 100 MW Solar Project Based On PPA With RUVNL Updated On Fri, Apr 5th, 2024 by Saurenergy Satjuj Jal Vidhut Nigam, (SJVN), an Indian public sector undertaking (PSU) involved in hydroelectric power generation and transmission invited bids for the design, engineering, supply, erection, testing, and commissioning of 100 MW (AC) solar power project at NAWA, DIDWANA KUCHAMAN, Rajasthan. SJVN issued the tender in response to the power purchase agreement (PPA) between SJVN […] Read more
Skydweller Aero Completes First Unmanned Flight Of Large Scale Solar-Powered Aircraft Updated On Fri, Apr 5th, 2024 by Saurenergy Skydweller, an uncrewed solar-powered aircraft which has a wingspan greater than a 747 and leaves zero carbon footprint, just completed the world’s first successful autonomous/unmanned/uncrewed flight of a large solar-powered aircraft, taking off, flying and landing by itself, without humans on-board or in control, from Stennis International Airport in the United States. “This is a […] Read more
The China Effect- 5 Global Solar Manufacturing Plans Hit By The Solar Price Slump Updated On Thu, Apr 4th, 2024 by Saurenergy As the call for clean energy grows, solar plants and plans to manufacture solar equipment have garnered the limelight across the world. But the recent trend of dropping prices, thanks largely to the massive production glut in China, has put paid to many such plans. This oversupply across the solar supply chain, that started first […] Read more
Husk Power Plans To Commission More Mini-Grids In India: William Brent (CMO) Updated On Thu, Apr 4th, 2024 by Saurenergy How did the journey of Husk Power Systems start? Husk Power’s journey started around 2008 with its co-founder, Manoj Sinha, and other like-minded people from Bihar. At that time, rural electrification was a major issue in India and states like Bihar. Husk came into the picture to ensure that the unserved communities in those areas […] Read more
South Africa’s Solar Adoption Gathers Pace, But Challenges Remain Updated On Thu, Apr 4th, 2024 by Saurenergy South Africa has long been plagued by an energy crisis now. This has led to a situation where the nation faces rolling blackouts or load shedding as it has been called, for the past decade and more. It says something for the state of the power sector that a challenge that was predicted well over […] Read more
NTPC-REL Invites Bids For 500 MW Solar Project In Rajasthan Updated On Wed, Apr 3rd, 2024 by Saurenergy NTPC Renewable Energy Limited (REL) a wholly owned subsidiary of NTPC Limited invited bids for the balance of the system package of a 500MW state transmission utility (STU) connected solar PV project in Bhadla, Rajasthan. NTPC Renewable Energy Limited (NTPC REL) invited online bids from eligible bidders on single-stage two envelopes (i.e. Envelope-I: Techno-Commercial Bid […] Read more
Deputy Manager/Manager – Procurement -Civil (Solar) Updated On Wed, Apr 3rd, 2024 by Saurenergy Ensuring proper and timely ordering of Packages, timely delivery, proper documentation of the process, timely payment to vendors and monitor the Cost Control statement of all the project package costs. Nature and Scope:- Aim at in time and qualitative sourcing of vendors for various packages. Follow the laid process of pre bid for sending tender […] Read more
Leroy Merlin To Draw Power From Better Energy Poland Solar Park By 2025 Updated On Tue, Apr 2nd, 2024 by Saurenergy Construction and decoration firm Leroy Merlin Poland has signed a PPA with Better Energy to draw power from latter’s Chelmno solar park which is currently under construction. The Power Purchase Agreement (PPA) is expected to commence in 2025. According to Better Energy, the 10-year PPA will allow Leroy Merlin Poland to secure the long-term supply […] Read more