IIT Delhi Halves Carbon Footprint With 4.7 MW Green Energy Capacity Updated On Mon, Apr 5th, 2021 by Saurenergy IIT-Delhi has achieved the milestone of becoming the 1st Central Govt funded technical institute to reduce its carbon footprint by over 50% Indian Institute of Technology – Delhi (IIT-D) has announced that from April 1, 2021, the institute achieved the milestone of becoming the first Central Government funded technical institute to reduce its carbon footprint […] Read more
Siemens Gamesa and Repsol Agree to Install 120 MW Across 4 Wind Farms in Spain Updated On Mon, Apr 5th, 2021 by Saurenergy Siemens Gamesa and Repsol have signed their first contract that will see the installation of wind turbines across four wind farms in Spain Siemens Gamesa and Spanish energy giant Repsol have signed their first contract together that will see the installation of 24 SG 5.0-145 wind turbines across four wind farms in Spain, with a […] Read more
Solis Seminar Episode 16: Leakage Current Failure Updated On Sat, Apr 3rd, 2021 by Saurenergy Background In the last episode of the Solis Seminar series we talked about how faults can occur during wet weather, in particular the importance of “PV Isolation Protection”. In this episode, we will discuss “leakage current failure” faults and cover possible causes as well as ways to prevent the issue. We will look at a […] Read more
AAP’s ‘Switch Delhi’ Focuses On Sensitizing Youth, Enters Final Week of Campaign Updated On Thu, Apr 1st, 2021 by Saurenergy AAP’s ‘Switch Delhi’ – eight weeks electric vehicle (EV) campaign has entered its final week and the Delhi government is endeavouring towards sensitising youth about the perks of EVs and Delhi EV policy in the final week of the campaign. Transport minister Kailash Gahlot termed Delhi’s EV policy as the “most progressive policy around the […] Read more
No way out for Stranded Thermal Assets in India, Amid RE Push : IEEFA Updated On Wed, Mar 31st, 2021 by Saurenergy India’s 40 GW of stressed and stranded thermal power assets, identified by a parliamentary committee in March 2018, still linger on – most of them without any feasible resolution. India’s 40 gigawatts (GW) of stressed and stranded thermal power assets, identified by a special parliamentary committee in March 2018, still linger on – most of […] Read more
Vestas Expands Footprint in Japan With two new Orders Updated On Wed, Mar 31st, 2021 by Saurenergy Global wind major Vestas has announced that it has expanded its footprint in Japan with a 43 MW order for the Yokohama-machi Wind Power Plant in Aomori prefecture, Japan. Owned by Japan Wind Development, the project will feature nine Vestas V117-3.45 MW and three Vestas V105-3.45 MW turbines with 94-meter towers. All turbines are delivered in 3.6 MW operating […] Read more
Improving Data Exchange Between Wind Farms and Power System key to Cost-Effective Energy Transition Updated On Wed, Mar 31st, 2021 by Saurenergy With increasing shares of distributed energy, seamless data exchange between power generation assets and grid operators is central to a cost effective management of the energy system. Clear guidance at EU level and consistent implementation at national level can reduce system operation costs. And they can make the EU power system more secure and reliable. […] Read more
Berlin-based Betteries Closes €2.1m Seed Funding Round to Upcycle EV Batteries Updated On Tue, Mar 30th, 2021 by Saurenergy Betteries, a startup based in Berlin which upcycles electric vehicle (EV) batteries into affordable power systems, announced that it has successfully closed its Euro 2.1m seed funding round led by impact funds Factor[e] Ventures and Beyond Black. Speaking of this investment achieved, CEO and founder of betteries, Dr. Rainer Hönig stated, “This seed round is […] Read more
Ørsted Commences Construction of its Largest Onshore Project Updated On Tue, Mar 30th, 2021 by Saurenergy Ørsted announces final investment decision on the combined wind and solar PV project Helena Energy Center in South Texas and integrates the US trading team into the Onshore business. Ørsted has taken a final investment decision on its largest onshore project to date, the 518 MW hybrid wind and solar PV project, Helena Energy Center, […] Read more