EverGreen, Datta Infra & Others Bag NTPC’s 1.2GW Hybrid Tender Updated On Thu, Oct 24th, 2024 by Saurenergy NTPC Limited has announced the results of its 1200 MW wind-solar hybrid tender. The power giant awarded contracts to four renewable project developers: Sembcorp Green Infra, Adani Renewable Energy, Green Prairie Energy III (EverGreen), Adyant Ensersol (Datta Infra), and ReNew Solar. As per the auction results, Sembcorp, Adani Renewable, and ReNew Power secured projects at […] Read more
Rajasthan’s New ‘RIPS’ Scheme Aims To Expedite RE Investments Updated On Wed, Oct 23rd, 2024 by Saurenergy In a pursuit to expand its renewable energy capacity, the Rajasthan government, released its Rajasthan Investment Promotion Scheme (RIPS). It intends to capitalize on an average of 300 to 325 sunny days each year with 24.22 GW solar energy and 5.19 GW wind energy. This scheme envisions to build on the state’s strengths in renewable […] Read more
Himachal Pradesh Invites Private Players To Expand EV Charging Network Updated On Wed, Oct 23rd, 2024 by Saurenergy The Himachal Pradesh Cabinet, in a recent meeting, approved involving private players to expand the EV charging station network along the state’s six green corridors. It was highlighted that 77 EV charging stations are already operational on these corridors. The Cabinet also approved the establishment of automated testing stations for vehicle fitness assessments, utilizing advanced […] Read more
Apprentice Updated On Tue, Oct 22nd, 2024 by Saurenergy Operate equipment used in the manufacturing of photovoltaic solar modules. Conduct shop floor activities necessary to maintain safety, quality and throughput of all aspects of the module manufacturing operation. Setup and operate Vapor Transport Deposition (VTD), and sputter coater equipment, and selected Series 7 equipment as necessary. Assist in the installation and qualification of manufacturing […] Read more
CERC Takes Into Account PSPs, Offshore Wind, Changes Transmission Rules Updated On Mon, Oct 21st, 2024 by Saurenergy The Central Electricity Regulatory Commission (CERC) has made changes to the rules about how costs are shared for using the Inter–State Electricity Transmission System (ISTS) These new rules have been named CERC (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2024. For power plants that connect to both the national (inter-State) and local […] Read more
India’s Coal Sector Need Rs. 3,29,651 Cr Investment For Green Makeover: iForest Updated On Mon, Oct 21st, 2024 by Saurenergy Internationally, countries like the United Kingdom (UK) have recently shut down their last coal power plant. India, despite being the third largest emitter globally, simply cannot follow suit, even as it has established its first committee to develop a just transition framework. This framework aims to prepare guidelines for the government to transition away from […] Read more
AMPIN Achieves Financial Closure For 200MWp Hybrid Project Updated On Thu, Oct 17th, 2024 by Saurenergy Renewable energy company AMPIN Energy Transition has announced financial closure for its 200MWp Solar-Wind Hybrid project situated in the state of Rajasthan. The green loan financing for the project has been secured from Standard Chartered. The total investment for this project is valued at Rs 944 crores (~USD113 Million). Upon completion, the solar-wind hybrid plant is expected […] Read more
Business Development Manager Updated On Tue, Oct 15th, 2024 by Saurenergy Backed by a leading India renewable developer and EPC player Develops and deploys scaled-up commercially attractive Green Hydrogen and Green Ammonia production plants Founded by industry professionals bringing in combined 50+ years of international experience in Renewables, Industrial Front End Engineering and Design (FEED), Industrial gas operations and safety and Project finance/Private Equity. Responsibilities:- Accountable […] Read more
Tata Steel Using Multiple Options To Boost Use Of RE: Probal Ghosh Updated On Tue, Oct 15th, 2024 by Saurenergy 1. What are the major works you are doing towards shifting to renewable energy for your operations? Integrated Steel plants are power intensive and require huge quantum of power. Currently, the standard BF-BOF route of making steel is in operation and the by-product gases generated in the process are utilised for meeting many heating purposes […] Read more