MNRE Minister launches First AI Powered Solar Line At Goldi Solar Updated On Mon, Mar 3rd, 2025 by Saurenergy Union MNRE minister Pralhad Joshi, has launched India’s first AI-powered solar manufacturing line at Goldi Solar’s newly built, state-of-the-art facility in Kosamba, Surat, Gujarat. This achievement marks a major leap in India’s renewable energy sector, integrating cutting-edge AI-driven processes to revolutionize solar PV module production. The AI-powered facility enhances precision, scalability, and efficiency in solar […] Read more
Customer Service To Forefront As India’s Solar Boom Spreads Updated On Mon, Mar 3rd, 2025 by Saurenergy India’s solar ambitions are on a roll, and that’s visible in more ways than one. More and more solar installations are popping up if you look up from your phone around you, the number of solar firms listed on stock exchanges has gone up exponentially within two years, and of course, celebrities and influencers can […] Read more
MSEDCL Has Early Win in 2025 With 100 Day Solar Rooftop target Achieved Updated On Mon, Mar 3rd, 2025 by Saurenergy Maharashtra State Electricity Distribution Company Ltd (MSEDCL), the key Maharashtra discom outside Mumbai, enjoyed a rare renewable win with the achievement of its 100 day target for solar rooftops in Nagpur met in 82 days. The gains were largely the result of the PM Suryaghar rooftop scheme, with more than 1.5 lakh beneficiaries opting for […] Read more
Junior Engineer – Civil (Solar EPC) Updated On Fri, Feb 28th, 2025 by Saurenergy Responsibilities:- Site Supervision & Execution:- Assist in civil construction activities for solar power plants, including foundation works, roads, drainage, and fencing. Support land grading, excavation, and site leveling based on project Supervise pile foundations, RCC structures, and mounting system installations. Ensure adherence to construction schedules and quality standards. Coordination & Quality Control:- Work closely with […] Read more
Adani Fast-Tracks Khava RE Project, Commissions 275 MW Solar Project Updated On Fri, Feb 28th, 2025 by Saurenergy Adani Green Energy Twenty Five A Limited, a subsidiary of the Adani Green Energy, operationalized an incremental 275 MW of solar power project at Khavda, Gujarat. The company said in a regulatory filing, “With commissioning of this plant, AGEL’s total operational renewable generation capacity has increased to 12,258.1 MW.” The commissioning follows a 250 MW […] Read more
First Solar Q4 Results Continue To Wait On India Surge, Ships 14.1 GW Worldwide Updated On Fri, Feb 28th, 2025 by Saurenergy First Solar, Inc. has announced financial results for the fourth quarter and year ended December 31, 2024. The US-based company’s net sales for the fourth quarter were $1.5 billion, an increase of $0.6 billion from the prior quarter. The increase was primarily a result of increased module sales in the fourth quarter. In an earnings […] Read more
Adani Green Operationalize 67 MW Solar project At Khavda, Gujarat Updated On Tue, Feb 25th, 2025 by Saurenergy Adani Green Energy Twenty Six B Limited, a wholly owned step-down subsidiary of Adani Green, has operationalized a 67 MW solar power project at Khavda, Gujarat. The company said in a regulatory filing, “With the commissioning of this plant, AGEL’s total operational renewable generation capacity has increased to 11,983.1 MW.” Projects In Khavda On The […] Read more
2025: Solar, BESS To Account For 81% New US Capacity Addition Updated On Tue, Feb 25th, 2025 by Saurenergy The latest Preliminary Monthly Electric Generator Inventory report by the US Energy Information Administration (EIA) expects 63 GW of new utility-scale electric-generating capacity to be added to the US power grid in 2025. This amount represents an almost 30% increase from 2024, when 48.6 GW of capacity was installed, the largest capacity installation in a […] Read more
AGM – Quality Solar Module Updated On Mon, Feb 24th, 2025 by Saurenergy Roles and Responsibilities:- Reviewing and Monitoring for all levels of Quality Assurance and Control like Incoming Quality Control, In Process Quality Control and Final Quality Assurance of the Solar Photovoltaic Modules. MIS Preparation and ISO Documentation to prepare the Various Quality Reports and maintain the activity of Document Control as per the requirements of ISO […] Read more