43 Pumped Hydro Storage Projects With 55 GW Capacity Under Survey: Govt Updated On Wed, Dec 27th, 2023 by Saurenergy Union Power Minister R.K Singh in a written reply before the Parliament stated that a total of 43 Pumped Hydro Storage Projects (PSPs) are under survey and investigation in the country. He mentioned that these projects have an aggregate installed capacity of 55,085 MW. The minister also said that a total of four PSPs are […] Read more
Inox Wind Bags Repeat Order For 279 MW For Its 3 MW Wind Turbines Updated On Tue, Dec 26th, 2023 by Saurenergy Indian wind energy solutions company Inox Wind has bagged an order for 279 MW from a large Commercial and Industrial (C&I) player. The order is for Inox’s latest 3 MW Wind Turbine Generators (WTGs), and the scope comprises a mix of equipment supply with limited scope EPC for 180 MW and end-to-end turnkey execution for […] Read more
CERC Grants Compensation To Azure Power Over ‘Change of Law’ Events Updated On Fri, Dec 22nd, 2023 by Saurenergy In its latest judgment, the Central Electricity Regulatory Commission (CERC) allowed Azure Power compensation for ‘change of law’ events. These events were related to the Goods and Service Tax (GST) surge on solar products. The detailed order said that the case was related to three projects of Azure. This includes two 300 MW solar plants, each situated […] Read more
ReNew Enters November ALMM List With Module Making Facility Updated On Thu, Nov 23rd, 2023 by Saurenergy The November ALMM (Approved List of Module Manufacturers) list issued recently by the Ministry of New and Renewable Energy (MNRE) saw several significant developments. To begin with, there are three new entrants on the latest ALMM list of the ministry, taking the total number of solar module manufacturers in India up from 76 to 79 this month. […] Read more
Top 5 Reasons Why India’s Power Demand Exceeded Projections Updated On Mon, Nov 20th, 2023 by Saurenergy India’s power demand has been rising steadily. The country’s higher than anticipated peak demand has been in the news, with peak demand touching a lifetime high of 223 GW in June 2023 when peak deficit touched 0.17 percent. As per the Load Generation Balance Report (LGBR) released by the Central Electricity Authority, the peak demand […] Read more
THDC to Build RE Projects of 3270 MW in Karnataka Updated On Fri, Nov 10th, 2023 by Saurenergy Uttarakhand-based government firm THDC India Ltd (THDCIL) has set sights on establishing 3,270 megawatts (MWs) of clean energy projects in Karnataka with emphasis on pumped storage and floating solar in the state. The THDC project in Karnataka is likely to boost the growth of renewable energy in the state also increase the presence of THDC […] Read more
Cosmic Aims To Tap Offshore Market To Offer OEM Services: Shravan Gupta, Cosmic PV Power Updated On Fri, Nov 3rd, 2023 by Saurenergy How has the journey of Cosmic been in the last two years? In the last two years, our journey was quite fascinating. We are growing at a 100 percent growth rate. The growth rate was even higher when the Approved List of Module Manufacturing (ALMM) provisions were in place which safeguarded the interests of Indian […] Read more
Can’t Impose Licensing of Power Generation Under The Garb Of Approval: RERC Updated On Thu, Nov 2nd, 2023 by Saurenergy The Rajasthan Electricity Regulatory Commission (RERC), in its latest judgment, reiterated that discoms should not make attempts to impose licensing of power generation under the garb of approvals. The State Commission said that such moves could dilute the reforms made under the Electricity Act of 20023. “Delicensing of the generating plants and captive plants was one of […] Read more
Amazon Crowned As Leading Renewable Energy Corporate Buyer in India Updated On Tue, Oct 31st, 2023 by Saurenergy IT giant Amazon is now the largest corporate buyer of renewable energy in India. The firm sealed this position soon after it launched a 198 MW wind farm in Osmanabad, Maharashtra. The said project is the firm’s 50th renewable energy project in India, which has helped it take its capacity beyond 1.1 GW in India. As […] Read more