REIL Inviting Bids for 950KWp Grid Connected rooftop Solar PV Power Plant in Jaipur Updated On Wed, Jun 14th, 2017 by Saurenergy The scope of work for REIL’s 950KWp tender includes design, supply, engineering, erection, installation, and commissioning of the rooftop projects. Rajasthan Electronics & Instruments Limited (REIL), Jaipur is inviting bids for Installation- Commissioning & 6 year maintenance of 950 KWp grid connected solar PV power plants at rooftop of various buildings of Rajasthan University, Jaipur […] Read more
IBC SOLAR Commission 22.5 MWp Solar PV project in Phalodi, Rajasthan Updated On Wed, May 31st, 2017 by Saurenergy IBC SOLAR in India had the lead and overall responsibility for the solar PV project, the engineering and technical supervision was done by the German parent company, who also provided some key components. IBC SOLAR has announced that it has commissioned its sixth solar PV power plant in Rajasthan in the north of India. The […] Read more
Solar Power Juggernaut Will Keep Rolling Despite Higher Taxes Under GST Updated On Sat, May 27th, 2017 by Saurenergy According to a list of 1,211 items released after the meeting of the GST Council, which comprises finance ministers of all the states of the Union, “Photosensitive semiconductor devices; including solar photovoltaic cells, whether or not assembled in modules or made up into panels”, will be charged at a rate of 18 Goods and Services […] Read more
Uttar Pradesh government to set up 750 MW solar power plant at Badhla, near Jodhpur: Report Updated On Mon, May 22nd, 2017 by Saurenergy The Uttar Pradesh government is targeting to generating solar power from the project from October 2018. Uttar Pradesh government is reportedly gearing up to set up 750 megawatt solar plant at Badhla, near Jodhpur. According to ET UP government will draw the power in the state from the transmission network of Power Grid Corporation of […] Read more
Maharashtra Seamless Commissions 20 MW Solar Power Project in Rajasthan Updated On Fri, May 19th, 2017 by Saurenergy The power generated from the 20 MW DCR solar power project will be sold for Rs.5.07/kWh to the off-taker. One of the leading manufacturers of electric resistance welded and seamless pipes and tubes, Maharashtra Seamless has successfully commissioned a 20 MW Solar Power Project at village Khetusar in Jodhpur, Rajasthan. The company has also obtained […] Read more
Andhra Pradesh Government Plans to Float Tenders for Two Pilot Battery-Backed Solar Power Projects Updated On Thu, May 18th, 2017 by Saurenergy Andhra Pradesh Chief Minister N Chandrababu Naidu has emphasized the need to tap and store the solar power in reducing power charges. With rapid growth in the solar power capacity and changes in the battery backup technologies, the Andhra Pradesh Government plans to float tenders for two solar parks to be taken up on a […] Read more
RaysExperts adds 30 MW capacity to its Solar Parks, situated at Kolayat in Bikaner Updated On Tue, May 16th, 2017 by Saurenergy Around 99% of solar EPC companies in India have a total individual portfolio of less than 30 MW, however, Rays Experts, in a rare feat of sorts, achieved in just 3 months. RaysExperts has successfully commissioned projects that contributed an addition of 30 MW to Rays Solar Parks, situated at Kolayat in Bikaner. According to […] Read more
VIZ-A-VIZ with S.K Mahajan, Director, IB Solar Updated On Sun, Apr 30th, 2017 by Saurenergy Q. Kindly slate on the journey of the company so far. The business was founded in 1992 with a mere capital of Rs. 2000; my father was a retired government officer then. I have 16 years of experience with corporate industry before starting business under the name Integrated Marketing, which became Integrated Batteries India Pvt. Ltd. […] Read more
Rajasthan Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy Rajasthan Solar Energy Policy Updates 2017 The new fixed tariff of Rs. 3.93 (~$0.06)/kWh as the generic tariff levelised for 25 years for solar PV projects excluding accelerated depreciation (AD) has been announced by the Rajasthan Electricity Regulatory Commission (RERC) in October 2017. The fixed AD component is fixed at Rs. 0.27 (~$0.004)/kWh making the […] Read more