Flexible Solar Moves One Step Closer to Mass Market With DaZheng Updated On Tue, Jul 19th, 2022 by Saurenergy A 10 year old Chinese startup, DaZheng, has become the first firm worldwide to produce large, flexible perovskite solar panels at scale, with a promised efficiency of 21%. Traditional flexible thin-film solar cells are limited by expensive raw materials and complicated manufacturing processes, which lead to the high cost and limited applications. The new flexible […] Read more
Wartsila Will Supply Energy Storage To One Of The World’s Largest Solar Plus Storage Project Updated On Wed, Jul 13th, 2022 by Saurenergy Wartsila, a Finland-based technology company, has signed a contract with Clearway Energy Group. Under this contract, Wartsila will provide energy storage devices totaling a 500-megawatt (MWac) / 2-gigawatt hour (GWh) portfolio. The contract encompasses five sites in California and Hawaii and represent one of the largest solar-plus-storage project portfolios in the world. According to Wartsila, […] Read more
Trina Solar Added One More PV Factory for Stronger N-Type Cells Updated On Tue, Jul 5th, 2022 by Saurenergy Trina Solar New Energy Industrial Park project’s commencement ceremony was held in Xining. This New Energy Industrial Park project will effectively cover every stage of PV modules production, from polysilicon fabrication to modules made with 210 and N-type technology. 10 GW N-type modules are on the way, for higher customer value Trina claims that the […] Read more
Application of Silicone Sealant in Solar Modules Updated On Tue, Jul 5th, 2022 by Saurenergy Introduction Solar module manufacturing appears to be quite simple, yet the performance and life cycle of the module depends on every individual part, whose effective coordination is expected to extend the durable life of solar module to 25 years or longer. Today, we look at solar sealant, perhaps the least noticed, but a critical and […] Read more
Websol Energy To Set Up 1.8 GW Solar Cell And Module Facility Updated On Mon, Jul 4th, 2022 by Saurenergy To give a major boost to its manufacturing capabilities, Websol Energy System has said that it will be setting up a new manufacturing plant for solar cells and modules in near future. This will have a capacity to produce up to 1.8 GW of solar panels. Industry experts see it as a step towards self-reliance […] Read more
Bangalore Metro Rail Floats Tender For 20 MW Of Grid Connected Rooftop Solar System Updated On Mon, Jul 4th, 2022 by Saurenergy Bangalore Metro Rail Corporation Ltd (BMRCL) has invited bids for a grid-connected rooftop solar photovoltaic system of 20 MW. This tender includes design, engineering, supply, construction, erection, testing, commissioning, and grid synchronization. The power developer will be responsible for O&M, warranty for 25 years under RESCO Model. The last date to submit the bid is […] Read more
MSEDCL Issues 1 GW Tender for Solar Power Supply Updated On Wed, Jun 29th, 2022 by Saurenergy Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) has issued a new tender to procure 1 GW (1000 MW) of solar power supply through a competitive bidding process. MSEDCL will procure this solar power supply from those projects which are connected to the distribution network in Maharashtra under “Mukhyamantri Saur Krishi Vahini Yojana”. The last date […] Read more
Solis Seminar On The Importance of Using Photovoltaic Cables in Photovoltaic Systems Updated On Tue, Jun 28th, 2022 by Saurenergy Background In some photovoltaic power plant projects, ordinary cables have been used in replacement of dedicated photovoltaic cables, which can provide lower installation costs. This approach puts the entire solar PV system at risk and is dangerous. In this Solis seminar we introduce the differences between photovoltaic cables and ordinary cables, and the importance of […] Read more
Solar Power Cluster Of 1.5 GW Being Developed By Voltalia in Brazil Updated On Tue, Jun 28th, 2022 by Saurenergy France based RE player Voltalia has declared that its developing a new photovoltaic cluster with a potential capacity of more than 1.5 GW in the state of Minas Gerais in Brazil. The official statement of Voltalia informs that after developing its large clusters in Brazil at Serra Branca1 of 2.4 GW and Canudos2 of over […] Read more