Railway Ministry Tenders for Supply of AURA Energy Solar Lights for Guwahati Updated On Thu, May 21st, 2020 by Saurenergy The Ministry of Railways, under the Government of India (GoI), has floated tender inviting bids from eligible bidders for the supply and commissioning of AURA Energy Solar light with battery backup and solar photovoltaic (SPV) panels for Guwahati location. As per the tender details, the scope of work includes “supply and commissioning of AURA Energy […] Read more
GoSun Chill: Solar Cooler Updated On Sat, May 16th, 2020 by Saurenergy PRODUCT BRIEF: A portable cooler designed by GoSun to keep food cold or frozen, dry, and organised. The Chill is an off-grid refrigerator without the noisy generator and doesn’t need any ice which provides more space while reducing the overall weight. PRODUCT FEATURES: The primary source of power for the cooler are the solar panels […] Read more
Validity of Solar Project Tariffs Extended Until Sept 30 in Uttarakhand Updated On Sat, May 16th, 2020 by Saurenergy UERC has extended the validity for the benchmark capital cost and levelised generic tariff for solar power projects in Uttarakhand until September 30, 2020. The Uttarakhand Electricity Regulatory Commission (UERC) has published a new order extending the validity period for the benchmark capital cost and levelised generic tariff for solar power projects in the state […] Read more
Ultra-Thin Solar Cells Market to see 56.9% CAGR in Coming Years Updated On Thu, May 14th, 2020 by Saurenergy The global ultra-thin solar cells market, which generated USD 30 million in 2019, is expected to advance at a 56.9 percent CAGR between 2020 and 2030 The requirement for energy, which doesn’t release harmful gases, including carbon dioxide and carbon monoxide, during generation, is rising. Though numerous sources are utilised to produce renewable electricity, solar power […] Read more
Sembcorp, PUB Ink 25-Yr PPA to Build Largest Floating Solar Plant in S’pore Updated On Wed, May 13th, 2020 by Saurenergy With an aim to support Singapore’s 2 GWp target of installed solar capacity by 2030, Sembcorp Industries has entered into a 25-year power purchase agreement (PPA) with PUB, Singapore’s National Water Agency, to develop the country’s largest floating solar plant. As per the deal, Sembcorp through its arm Sembcorp Floating Solar Singapore will develop a 60 […] Read more
NTPC Tenders for HT Switchgear Package for Solar Project in M’rashtra Updated On Wed, May 13th, 2020 by Saurenergy State-owned NTPC, India’s largest energy conglomerate, has floated tender inviting eligible bidders for HT switchgear package of Solapur solar photovoltaic (PV) project at Solapur in Maharashtra. The earnest money deposited (EMD) for the tender is Rs 1 lakh and the tender fee is Rs 1,125 excluding bank charges. Further, the last date and time for document […] Read more
Brazilian Solar Industry Feels the Heat of Both Falling Economy, COVID-19 Updated On Tue, May 12th, 2020 by Saurenergy With the rising cost of imports, shrinking power demand and indefinite postponement of auctions amid coronavirus crisis, Brazilian solar photovoltaic (PV) industry is feeling the heat which may likely to impact the momentum of the annual installation. Brazilian PV sector’s annual installation capacity is expected to decline to 0.7 GW in 2020, from 1.3 GW […] Read more
Indian Oil Tenders for 150 kW Solar System in UP Updated On Mon, May 11th, 2020 by Saurenergy The Indian Oil Corporation (IOCL) has issued a tender for the commissioning of a solar power system at the firms’ LPG bottling plant in Kanpur, UP. The Indian Oil Corporation (IOCL) has issued a tender for the commissioning of a solar power system at the firms’ LPG bottling plant in Kanpur, UP. The scope of […] Read more
First Solar Inks Supply Agreement for 415 MW PV Modules With Geronimo Energy Updated On Thu, May 7th, 2020 by Saurenergy First Solar has entered into a supply agreement with Geronimo Energy to supply 415 MW of its Series 6 photovoltaic (PV) modules in 2022. First Solar has announced that it has entered into a framework supply agreement with Geronimo Energy, a National Grid company. Under the agreement, First Solar will supply 415 megawatts (MW) of its […] Read more