Assistant Manager Updated On Tue, Nov 30th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Azure Power Signs PPA’s For 600 MW With SECI For Its 4 GW Mfg. Linked Projects Updated On Thu, Nov 18th, 2021 by Saurenergy Azure Power today announced that it has signed Power Purchase Agreements (PPAs) for 600 MW ISTS connected solar power projects with Solar Energy Corporation of India (SECI), under its 4 GW manufacturing linked projects, which will supply power for 25 years at a fixed tariff of INR 2.54 (~US 3.4 cents) per kWh. The projects will be constructed in […] Read more
Annual PV Installations to Cross 200 GWdc Mark in 2022: IHS Markit Updated On Thu, Nov 18th, 2021 by Saurenergy Global solar PV installations will see over 20% growth in 2022 and surpass the 200 GWdc barrier for the first time, at a total investment of at least $170 billion, despite continuing rising costs of production, according to a new report by the Clean Energy Technology service at U.K.-based market observer IHS Markit. Until recently, declining […] Read more
Adani Green’s Q2 Analyst Call Highlights Updated On Tue, Nov 16th, 2021 by Saurenergy Adani Green Energy Limited, the main vehicle leading the group’s green energy push as a developer held it’s analyst call on October 29, shortly after its Q2 results were declared. While the results highlighted the strong growth, as well as the closure of the 5 GW SB Energy deal, starting up of PPA’s under the […] Read more
Array Technologies Buys STI Norland in $652 million Tracker Deal Updated On Mon, Nov 15th, 2021 by Saurenergy American solar tracker firm Array Technologies is in advanced talks to acquire Spanish tracker manufacturer Soluciones Técnicas Integrales Norland (STI Norland) in a deal valued at around €570 million (US$652 million) in cash (€351 million/US$401 million) and stock. The deal closure is expected by Q1 of 2022. In 2020, STI generated revenues and EBIDTA of […] Read more
October India RE Highlights From MNRE Report For Union Cabinet Updated On Mon, Nov 15th, 2021 by Saurenergy In its monthly summary of key highlights, recently shared for the month of October, the Ministry of Renewable Energy (MNRE) has focused on renewable energy additions, international conferences and important developments in the work of Solar Energy Corporation of India (SECI). The ministry informs that a total of 1522.35 MW of renewable energy (RE) capacity […] Read more
South India’s Largest Renewable Energy Expo, RenewX Returns With 5th Edition Updated On Mon, Nov 15th, 2021 by Saurenergy Informa Markets in India, has announced the 5th edition of RenewX, a two-day Renewable Energy trade expo slated on November 19 and 20, 2021 at the Hitex, Hyderabad. RenewX 2021 will provide an Industry platform to the renewable energy buyers and sellers enabling them to connect and collaborate for generating business opportunities. The expo aims to […] Read more
China’s Largest PV Plant In Quinghai Offers A study On Co-Existing With Nature Updated On Fri, Nov 12th, 2021 by Saurenergy China’s Tara Beach, located 60 kilometres southeast of Qinghai Lake, in the island province of Hainan, is bathed with a blue sea of solar panels. It houses the world’s largest renewable energy base that was built by Huanghe Hydropower Development, a state-owned utility company, with technological contributions from ICT provider Huawei. A 2.2 GW solar plant — the Tara […] Read more
LONGi Hi-MO 5 Shows Excellent Performance in Dynamic Load Testing Updated On Thu, Nov 11th, 2021 by Saurenergy In order to validate the performance of its 182mm Hi-MO 5 module under extreme weather conditions, LONGi has carried out rigorous dynamic load testing (DML) on the bifacial Hi-MO 5 at the China General Certification (CGC) laboratory. The test sample was randomly selected from modules under mass production, with results showing that, under installation conditions […] Read more