Quality Control of PV Plants with on-site Mobile PV Modules Test Laboratory Updated On Tue, Mar 26th, 2019 by Saurenergy Satish Pandey (Author), Basant Jain, Sandeep Jadhav and Preetha Pillai Mahindra Susten Pvt. Ltd Abstract- This paper explains the benefits of On-site mobile PV Test Laboratory developed in India by Mahindra Susten Pvt Ltd (MSPL) & launched in market in September-2017. This On-Site Mobile PV laboratory is the only one existing in India which can […] Read more
CECEP Connects World’s Largest Floating Solar Plant in China Updated On Fri, Mar 22nd, 2019 by Saurenergy Chinese state-owned developer CECEP, in collaboration with French floating solar specialists Ciel & Terre, has connected its 70 MW floating solar power plant in Anhui, China to the grid after the project successfully cleared all tests and monitoring. Located on a former coal-mining area, in Yongqiao district, Suzhou city, the floating PV array will mainly […] Read more
In a First: Solar Panels That Store Both Electricity and Heat Updated On Wed, Mar 20th, 2019 by Saurenergy Building-integrated PV cells that supply both heat and electricity have been developed at SINTEF’s solar cell lab in Trondheim. One answer to new energy demands of the world is to install building-integrated PV (BIPV) cells, either in the form of roof tiles or facade elements. However, the feasibility of this will require lower costs and […] Read more
Atlas Renewable Energy Secures $152 Mn For Financing of 3 Solar Plants in Brazil Updated On Wed, Mar 20th, 2019 by Saurenergy The three projects are estimated to benefit around 470,000 families per year with clean, renewable energy and will avoid the emission of 108,000 tons of CO2 annually. Atlas Renewable Energy, a leader in clean energy in Latin America, announced the completion of long-term financing of three of its solar energy plants in Brazil for a total amount […] Read more
Hanergy Launches Netherland’s Largest Thin-Film Solar Power Industrial Park Updated On Sat, Mar 16th, 2019 by Saurenergy The 11.4 MW park spans across 22 hectares and aims to produce annually the electricity equivalent for 3,500 households in the Netherlands. The world’s largest thin-film solar power solution company, Hanergy Thin Film Power Group, has officially launched Roodehaan solar park in Groningen, Netherlands, generating power equivalent for 3,500 households annual consumption in the Netherlands. The event […] Read more
Hanergy’s Thin Film Solar Panels to Assist in Antarctic Meteorology Research Updated On Fri, Mar 15th, 2019 by Saurenergy Hanergy’s thin-film solar panels will be utilized in the equipment and observation station in the Antarctic region which will aid the meteorology research. The world’s largest thin-film solar power solution company, Hanergy Thin Film Power Group (00566.hk), sustains its grandeur in the industry. As per the recent development, the clean energy giant has signed an […] Read more
100MW Solar-Fishery Plant Takes the Lead with Huawei 1500V Smart PV Solution Updated On Wed, Mar 13th, 2019 by Saurenergy Multipurpose use of land increases both the agriculture and fishery revenue and improves the integrated utilisation efficiency of land. The Sihong 100MW PV project, a solar-fishery plant constructed by SPIC Jiangsu Electric Power Co., Ltd. in China has taken a step towards the lead in grid-tied power generation, with the use of the most advanced Huawei […] Read more
CEL Issues Tender For 315 kW Solar Power Plant in Uttar Pradesh Updated On Wed, Mar 13th, 2019 by Saurenergy The last date of bid submission is March 22, 2019. The Central Electronics Limited (CEL) has issued a tender inviting online bids from eligible parties for the deployment of 315 kWp grid-connected solar PV power plant at its campus in Sahibabad, Uttar Pradesh. The brief scope of work for selected bidder(s) will include the design, […] Read more
The Message from Gujarat. The Solar Price Squeeze to stay in 2019 Updated On Tue, Mar 12th, 2019 by Saurenergy After the boom of 2017, solar power developers in India ran into a big, if not completely unexpected problem. Government expectations of price drops, when it came to bidding at auctions. The cancellation of the 1000 MW auction by Gujarat Urja Vikas Nigam Limited (GUVNL), for its Dholera solar park site was on expected lines. […] Read more