Growatt Hikes Investment in India’s Growing Rooftop Solar Market Updated On Mon, Apr 22nd, 2019 by Saurenergy It also added that, if policy and financing support comes in, rooftop installations will take off for sure. Buoyed by the growth of Indian rooftop solar market, China-based PV-solar inverters maker Growatt has started increasing its investment in the country. Speaking on the investment, Growatt, Regional Director, Rucas Wang said, “Indian solar market is on […] Read more
Touchdown – Solar Power Makes a Smooth Landing at Indian Airports Updated On Mon, Apr 22nd, 2019 by Saurenergy With over 100 operational airports, civil aviation in India has emerged as one of the fastest growing sectors in the country during the last three years. India is currently considered the third largest domestic civil aviation market in the world. India’s passenger traffic grew at 16.52 per cent year on year to reach a whopping […] Read more
MNRE Issues Revised Guidelines For Series Approval of SPV Modules Updated On Thu, Apr 18th, 2019 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued revised guidelines for series approval of solar PV modules for conducting testing in test labs for implementation of Solar Photovoltaics Systems, Devices and Component Goods Order 2017. The guidelines are issued to facilitate labs/manufacturers in the formation of series of products for approval of product […] Read more
India’s Solar Sector Expected to Outperform Globally Despite Challenges: Report Updated On Tue, Apr 16th, 2019 by Saurenergy A new report by Fitch Solutions has predicted that the Indian solar power capacity will grow at an annual average rate of 15.3 percent to reach 105.9 GW by 2028, up from 26 GW in 2018. The report highlights that India will continue to outperform rival markets over the next decade as recent problems such […] Read more
Solar Waste Management and Manufacturing Standards Policy Needed: Report Updated On Fri, Apr 12th, 2019 by Saurenergy The government needs to bring out a policy on solar module waste management and standards for use of material for manufacturing, according to consultancy Bridge To India. “There is an urgent need to formulate appropriate quality standards for use of environmentally sustainable materials in manufacturing of modules. This will help in minimising potentially hazardous end-of-life […] Read more
Kerala Legislative Assembly to go Solar, KELTRON Floats Tender Updated On Fri, Apr 12th, 2019 by Saurenergy The specification asking for poly-crystalline modules is a surprise, considering that poly modules are close to being obsolete now. The last date of bid submission is April 16, 2019. The Kerala State Electronics Development Corporation Limited (KELTRON) has issued a tender for the supply of solar PV modules, solar inverter and solar battery at the […] Read more
MNRE Seeks Views on Draft Specifications & Testing Procedure for Universal Solar Pump Controller Updated On Thu, Apr 11th, 2019 by Saurenergy The MNRE has proposed to consider the use of USPC to increase the utility of solar PV system installed for solar water pumps. Therefore, it has formulated the draft specifications and testing procedure for USPC. After inviting suggestions on draft guidelines for lab testing of storage batteries and inverters, the Ministry of New & Renewable […] Read more
Israel’s Megalim Concentrated Solar Power Plant Begins Operations Updated On Thu, Apr 11th, 2019 by Saurenergy The Megalim solar thermal power plant, a joint venture of BrightSource, GE Renewable Energy and the Noy Fund, said on 10 April, that it has begun commercial operation in Israel. The Ashalim Solar Thermal Power Station, located in Israel’s Negev desert, is one of the largest projects of its type in the world. It is […] Read more
ReNew Power Commissions 300 MW Solar Plant in Karnataka Updated On Wed, Apr 10th, 2019 by Saurenergy ReNew Power Limited, one of India’s largest renewable energy Independent Power Producer (IPP) has successfully commissioned its 300 MW solar power plant at the Pavagada Solar Park in the Tumkur district of Karnataka. The 300 MW solar installation is now the company’s largest commissioned solar plant in the country in terms of capacity. The plant […] Read more