Three Phase Inverter Launch Power up FIMER’s Range Updated On Wed, Jan 27th, 2021 by Saurenergy With renewable energy, led by solar power, potentially making up 80 percent of the growth in electricity generation over the next decade, FIMER has introduced its new PVS- 10/33-TL three-phase string inverter solutions for commercial and industrial applications. According to the International Energy Agency, it is now consistently cheaper to generate electricity by capturing the […] Read more
Tigo Energy Raises $20 Million in Funding Updated On Fri, Jan 15th, 2021 by Saurenergy Tigo Energy, Inc., the worldwide leader in Flex-MLPE (Module Level Power Electronics) today announced a $20 million round of investment, led by Energy Growth Momentum. “2020 has been a breakout year for Tigo and 2021 has the potential for even greater success,” stated Zvi Alon, Chairman and CEO of Tigo. “We are excited to have the […] Read more
Civil Manager (Design) Updated On Sat, Jan 9th, 2021 by Saurenergy Incumbent will be responsible for: Substation design & detail engineering (Civil & Structure) Civil & Structural design of Solar Project (Minimum 100 Mw Projects) Proposal/Pre Bid engineering Design of module mounting structures, Control room buildings, Roads, Drainage and various equipment foundations for the completion of a solar power project. Estimation and costing of Projects. Preparation […] Read more
Vistra Brings Online its 1200 MWh Battery Storage System in California Updated On Fri, Jan 8th, 2021 by Saurenergy Vistra has announced its 1200 MWh Moss Landing Energy Storage Facility was successfully connected to the power grid and has begun operation. Vistra has announced that its Moss Landing Energy Storage Facility was successfully connected to the power grid and began operating on December 11, 2020. At 300 MW/ 1200 MWh, the lithium-ion battery storage system, located […] Read more
COVID-19 Slowed Down Energy Efficiency Progress in the US: Report Updated On Mon, Dec 21st, 2020 by Saurenergy More US states adopted or advanced new energy-saving targets, but COVID-19 slowed other efficiency efforts, according to the ‘2020 State Energy Efficiency Scorecard’. More US states have adopted or advanced new energy-saving targets and vehicle and appliance rules, but COVID-19 slowed other efficiency efforts, according to the ‘2020 State Energy Efficiency Scorecard’. For the first […] Read more
RfP for Transmission System for Evacuation of Power from SEZ in Rajasthan Updated On Tue, Dec 15th, 2020 by Saurenergy REC seeking Transmission Service Provider to establish transmission system for the evacuation of power from SEZ in Rajasthan under phase II The Ministry of Power has appointed REC Transmission Projects to be the Bid Process Coordinator (BPC) for the purpose of selection of bidder as Transmission Service Provider (TSP) to establish transmission system for transmission […] Read more
NextEra in the US, Adani Green In India, More Similar Than They Seem Updated On Wed, Dec 9th, 2020 by Saurenergy One is the market cap leader among renewable firms in India, and going by its project pipeline, a potential global leader. The other is the world’s largest solar and wind energy firm owned by investors, poised to enter the next big opportunity in electric mobility too. The renewable energy boom, when it comes in, surprised […] Read more
‘Suns-Voc’ Testing System That Could Become the IoT of Photovoltaics Updated On Mon, Dec 7th, 2020 by Saurenergy A new system ‘Suns-Voc’ developed by a team of researchers from Arizona State University which can measure solar performance over the long term in scalable photovoltaic systems, is being considered as a breakthrough in the cost and longevity of interconnected power delivery. Solar cells are only “current-voltage” tested in the lab before they are deployed […] Read more
MNRE Issues Guidelines For PM-KUSUM Scheme At Feeder Level Updated On Mon, Dec 7th, 2020 by Saurenergy The Ministry of New and Renewable (MNRE), after consultation with state governments, has decided to issue Guidelines for Implementation of Feeder Level Solarisation under Component-C of PM-KUSUM Scheme. The Scheme consists of three components. Component-A includes installation of Decentralized Ground Mounted Grid Connected Renewable Power Plants, Component-B includes installation of standalone Solar Powered Agriculture Pumps […] Read more