Say Goodbye To 2020’s Low Solar Bids, As Price Hikes Continue In Modules, Cells Updated On Wed, May 26th, 2021 by Saurenergy The record low prices last seen in GUVNL’s 500 MW auction, when NTPC won with a bid of Rs 1.99/ unit, may be a distant memory as solar equipment prices continue their upward march in 2021. Those low prices in the last big auction of 2020, blamed on NTPC flexing muscle and projections of a […] Read more
Tata Power Solar Systems Bags Rs. 188 Crore EPC Contract From NHPC Updated On Wed, May 26th, 2021 by Saurenergy NHPC, an Indian government hydropower board under the ownership of Ministry of Power, announced yesterday its placement of an order amounting to Rs 188.19 crore with Tata Power Solar Systems Ltd, a Mumbai-headquartered solar energy services provider, to set up a 40 MW solar power project at Ganjam, in Odisha. Tata Power Solar, a wholly-owned […] Read more
Chhattisgarh Invites Bids From Solar Modules Suppliers Updated On Tue, May 25th, 2021 by Saurenergy The Chhattisgarh State Renewable Energy Development Agency (CREDA) has invited bids from the developers or suppliers for standardization of rates for the supply of solar modules of different capacities (75W-315W) for solar application in the state. The modules need to come with ten years onsite warranty conforming to the Bureau of Indian Standards (BIS) and […] Read more
Canadian Solar Financial Results Q1 FY21 Out; 32% YoY Rise in Revenue Updated On Fri, May 21st, 2021 by Saurenergy Guelph-headquartered solar PV modules manufacturer Canadian Solar Inc. yesterday announced its financial results for the quarter ended March 31, 2021, reporting a 32% YoY increase in revenue and a net income of $23 million. In Q1 2021, the company’s solar module shipments were 3.1 GW, compared to guidance of 3.0 GW to 3.2 GW. Net revenue […] Read more
Okaya Power Commissions 100 kW Hybrid Solar Plant in Himachal Updated On Thu, May 20th, 2021 by Saurenergy Okaya Power has commissioned a 100 KWp hybrid solar plant at its manufacturing unit at Baddi in Himachal Pradesh. Okaya Power has announced that it has commissioned a 100 KWp hybrid solar plant at its manufacturing unit at Baddi in Himachal Pradesh. The plant is expected to generate around 144 MWh of clean energy annually according to the company, and further help […] Read more
ReNew Power Goes with Gujarat For Solar Component Manufacturing Plant Updated On Tue, May 18th, 2021 by Saurenergy Leading renewable energy firm ReNew Power has announced that it will be going to Gujarat for the development of a solar cell and module manufacturing plant. The manufacturing plans had been announced by ReNew Power last year, and it has picked the Dholera Special Industrial Region (DSIR), about 100 km away from Ahmedabad . Gujarat, […] Read more
Chhattisgarh Renewable Agency Tenders For 20K Solar Pumps Updated On Fri, May 14th, 2021 by Saurenergy Chhattisgarh Renewable Energy Development Agency (CREDA), has invited bids for supply of 20,000 solar pumps of 3 HP and 5 HP capacity, in the state during the period 2021-2023. CREDA is the nodal agency for solar power development in Chhattisgarh. The tender covers standardisation of Rates for Survey, design, supply, installation and commissioning of Solar […] Read more
PLI Scheme for Solar Manufacturing to Benefit Incremental Demand till FY30: Report Updated On Wed, May 12th, 2021 by Saurenergy According to a new report India’s solar modules manufacturing under production linked incentive (PLI) scheme will benefit incremental panels demand till the financial year 2030 (FY30). Ind-Ra estimates that the allocation of INR 45 billion towards the solar modules manufacturing industry by the Ministry of New and Renewable Energy (MNRE) can benefit the sales of […] Read more
PLI Scheme for Manufacturing of High Efficiency PV Modules a Positive for Domestic OEMs: ICRA Updated On Tue, May 4th, 2021 by Saurenergy The Ministry of New & Renewable Energy (MNRE) has notified the guidelines for the Production- Linked Incentive (PLI) scheme to promote the domestic manufacturing of high-efficiency solar modules and thereby reduce dependence on imports in the solar power sector. The scheme has been approved with a financial outlay of Rs. 4500-crore over a period of […] Read more