DGTR’s Third Anti Dumping Investigation. Too Little, Too Late? Updated On Tue, May 18th, 2021 by Saurenergy The announcement by the ministry of commerce and industry of the Directorate General of Trade Remedies (DGTR) starting an anti-dumping probe on imports of solar cells imported from China, Vietnam, and Thailand was made yesterday. The move, while following due process as one would hope, leads to several questions regarding its relevance. Perhaps the only […] Read more
Top 10 Polysilicon Rankings for 2020- The Future To be 90 Percent China Updated On Mon, May 17th, 2021 by Saurenergy German research firm Bernreuter research has released its latest ranking of Polysilicon manufacturers, and the prognosis for non-Chinese manufacturers is not good. The firm predicts that the world’s four largest polysilicon manufacturers in 2022 will all be based in China. in 2020, Wacker Chemie, the German firm which was actually no. 1 till 2019, lost […] Read more
Associate Manager – Operations & Maintenance Updated On Fri, May 14th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
TATA Power’s Q4 FY21 Results: Revenues Jump 50% Updated On Fri, May 14th, 2021 by Saurenergy Mumbai-based electric utility company Tata Power Limited released its financial results for the fourth quarter of FY21 ended March 31, 2021, announcing a marginal rise of one per cent in consolidated net profit at Rs 481.21 crore (Rs 474.70 crore in the year-ago period), due to saving in finance cost offset by an exceptional gain […] Read more
MNRE Grants Conditional Extension for RE Projects due to 2nd Wave of COVID Updated On Fri, May 14th, 2021 by Saurenergy MNRE has decided that RE projects with SCD on or after April 1, 2021, will be eligible to claim a time extension for completion of work. The Ministry of New and Renewable Energy (MNRE) has notified that after considering the representations received from project developers and stakeholders, it has been decided that as a measure […] Read more
Is India on a delusional path to progress? Updated On Wed, May 12th, 2021 by Saurenergy By Dr. Hitesh Doshi, Chairman and Managing Director, Waaree Group With the advent of the novel Coronavirus, the Indian economy is witnessing a major slowdown. While the nation is fighting the virus with all its might, businesses across sectors are reeling under the tremendous pressure of sustaining themselves. The ground reality of the Indian solar […] Read more
MNRE’s New Scheme Guidelines for 12,000 MW CPSU Phase-II Project Updated On Tue, May 11th, 2021 by Saurenergy The ministry of new and renewable energy (MNRE) has released the newly amended scheme guidelines for implementation of Central Public Sector Undertaking (CPSU) Scheme Phase-II (Government Producer Scheme) for setting up 12,000 MW grid-connected Solar PV power projects by the Government Producers. These 12,000 MW projects will be produced by the government producers with Viability […] Read more
Renewables Powering Through the Pandemic: IEA Updated On Tue, May 11th, 2021 by Saurenergy Renewable electricity expanded at fastest pace in two decades, with huge additions of solar and wind becoming the ‘new normal’ going forward Renewable sources of electricity such as wind and solar grew at their fastest rate in two decades in 2020 and are set to expand in coming years at a much faster pace than […] Read more
Senior Engineer – Operations & Maintenance Updated On Mon, May 10th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more