Assistant Manager – Mechanical Maintenance Updated On Fri, Jul 30th, 2021 by Saurenergy This position is responsible to ensure improvement projects and effective up keep and maintenance of Tooling (Carcass drum, shaper drum, B&T Drum) and Material handling equipment (Manual and Power) at Halol plant to ensure maximum machine availability and minimum downtime on account of breakdown. The incumbent shall also lead the improvement projects at the plant […] Read more
Sr. Manager Technical- Heat Engineering Updated On Fri, Jul 30th, 2021 by Saurenergy Process & Product:- Lead activities that involve issuing reports, conducting product quality audits, issuing and dispositioning held up product, process and material specifications related to maintaining and improving the product quality within the manufacturing process. Validate and release new curing press with in project timeline. Lead and execute Thermocouple study and validation processes as per […] Read more
AEMO Plans 5 Energy Scenarios for Net Zero Latest by 2050 Updated On Fri, Jul 30th, 2021 by Saurenergy The Australian Energy Market Operator (AEMO) has published its “2021 Inputs, Assumptions and Scenarios Report” (IASR) incorporating five future energy scenarios which will inform AEMO’s 2022 Integrated System Plan (ISP). One of these scenarios, Hydrogen Superpower, comprises a zero emissions grid by 2035. The five scenarios are Slow Change, Steady Progress, Net Zero 2050, Step Change, […] Read more
Asia Held 92% Share in Global PV Module Production in 2020: Report Updated On Thu, Jul 29th, 2021 by Saurenergy The recently published Photovoltaics Report, produced under Dr. Simon Philipps (Fraunhofer ISE) and Werner Warmuth (PSE Projects GmbH), explores key details about the photovoltaics manufacturing sector at the end of 2020 in Germany, the European Union and worldwide, including Asia. The Fraunhofer Institute for Solar Energy Systems ISE, supported by PSE Projects GmbH, has been […] Read more
RenewSys Launches New Module Facility in Maharashtra Updated On Thu, Jul 29th, 2021 by Saurenergy RenewSys India Pvt. Ltd. has set up a new manufacturing line for 2 GW of PV modules in a phased manner at Patalganga, Maharashtra, the company has said in a statement. The Mumbai-based module manufacturer expects the new facility, which is about 1.2 hours away from the JNPT port, to strengthen its customer service capabilities […] Read more
ANAND Group and Mando Corporation Form Joint Venture for EV Market Updated On Wed, Jul 28th, 2021 by Saurenergy The global producer of automotive products, ANAND Group has formed a new joint venture (JV) with Mando Corporation, a Korean OEM of automobile parts. The new JV company named ANAND Mando eMobility will manufacture and supply Motor and Controller for the emerging two and three-wheeler Electric Vehicle (EV) Market. To capitalize on the emerging opportunity […] Read more
ST’s Bouskoura Plant to Use 50% Energy from Renewables by 2022 Updated On Wed, Jul 28th, 2021 by Saurenergy French-Italian semiconductor manufacturing company STMicroelectronics has announced that its Bouskoura site in Morocco will procure 50% of its energy from renewable sources by 2022 compared to 1% in 2020, as part of its action plan to achieve carbon-neutrality by 2027. ST has been present in Bouskoura for over 20 years with a back-end plant which employs […] Read more
Lohum Plans Integrated Li-Ion Unit f 3 GWh/3000 MWh At Gr. Noida Facility Updated On Wed, Jul 28th, 2021 by Saurenergy LOHUM, positioned as the world’s leading integrated lithium-ion battery player, has announced that it will set-up 3GWh capacity single-location integrated Li-ion battery manufacturing and recycling factory in Greater Noida, Uttar Pradesh within the next 18 months. The integrated factory will have the battery manufacturing capacity of 1 GWh/ 1,000 MWh and 2GWh/ 2,000 MWh of […] Read more
Hitachi ABB Power Grids Commissions UHVDC Transmission Link in India Updated On Wed, Jul 28th, 2021 by Saurenergy Hitachi ABB Power Grids in India has announced the successful commissioning of one of India’s longest ultra-high voltage direct current (UHVDC) transmission links for Power Grid Corporation of India Limited. A +/-800 kilovolt (kV), 6,000MW transmission link that connects Raigarh, Chhattisgarh, with Pugalur, Tamil Nadu, and stretches over 1,800 kilometers. Notably, this transmission link can […] Read more