MNRE to Compile List of All Solar PV Cells and Modules Updated On Thu, Jan 3rd, 2019 by Saurenergy All the models and developers which comply with the BIS standard will be complied in a list called ‘Approved List of Models and Manufacturers’. In accordance with the BIS certification for solar modules and solar cell manufacturer and to ensure the longevity of such projects, the Ministry of New and Renewable Energy (MNRE) has decided […] Read more
Viz-A-Viz with Vishal Amin, Director (Solar Division), Lubi Electronics Updated On Wed, Dec 26th, 2018 by Saurenergy Q. Please tell us something about Lubi Solar including the vision behind its formation and its current role in the market. Lubi Solar is a division of Lubi Industries, a premier name in pumping industry. We at LUBI believe in the concept of continuous improvement by adopting new and progressive technology in our existing products […] Read more
NTPC Invites Bid for 20 MW Floating Solar Plant in UP Updated On Thu, Dec 20th, 2018 by Saurenergy Successful bidder shall also be responsible for operation & maintenance of SPV Plant along with, consumables and spare parts for three years. NTPC has recently issued a tender inviting bid for the development of 20 MW floating solar power project at the reservoir of NTPC Auraiya Gas Power Plant at Dibiyapur in Auraiya district of […] Read more
Wintery Breath Clouding The Sunny Solar Sky! Updated On Wed, Dec 19th, 2018 by Saurenergy Winter has already approached and the month of December is also knocking our doors. Before we plan for Christmas and New Year holidays, I reckon, this is the perfect time to look back on the past one year journey of our solar industry and do some analysis on it. This New Year not only brews […] Read more
Interview with Dr Rahul Kapil, Operations VP, Director of Longi Solar Updated On Wed, Dec 19th, 2018 by Saurenergy Longi Solar – world’s one of the leading manufacturers of high-efficiency mono-crystalline solar cells and modules. It has been focusing on MONO for 18 years and is the largest supplier of mono-crystalline silicon wafers in the world, with total assets above $5.23 billion (2017). In an exclusive interview with Saur Energy International during the […] Read more
NTPC Issues Tender for 25 MW Floating Solar Project in Andhra Pradesh Updated On Mon, Dec 17th, 2018 by Saurenergy Prospective bidders are required to provide GSTIN number at the time of purchase of bidding documents, the tender document mentions. National Thermal Power Corporation has issued a tender for the development of 25 MW Floating Solar PV Project at NTPC Simhadri in Andhra Pradesh. The scope of work includes the design, engineering, manufacturing, supply, packing […] Read more
NHPC Floats Tender for 32 MW Solar Project in Uttar Pradesh Updated On Mon, Dec 17th, 2018 by Saurenergy The deadline for the submission of the bid is January 29, 2018 and the project will be developed on a turnkey basis. National Hydroelectric Power Corporation has recently issued a tender for engineering procurement and construction (EPC) of a 32 MW grid connected solar PV project to be developed in Uttar Pradesh. The deadline for […] Read more
SECI Notifies Date of RfS Document for 2.5 GW Solar Project in Kargil Updated On Sat, Dec 15th, 2018 by Saurenergy The scope of work shall comprise setting up of the Solar PV Projects along with implementation of the entire power evacuation infrastructure. Solar Energy Corporation of India in a notification informed that the RfS document for the 23 GW solar project to come up in Leh and Kargil Regions will be issued on December 31, […] Read more
Tariff Putting a Dent on the US Solar Industry Updated On Fri, Dec 14th, 2018 by Saurenergy The report also mentioned that 9000 jobs mainly in construction or engineering were either not added, or lost due to the tariffs. The ongoing trade dispute between the United States and China has put a dent on the Solar Industry in the US according to a new report from the Solar Energy Industry Association and […] Read more