Bihar Set To Expand Its Network Of Floating Solar Plants Updated On Mon, Apr 22nd, 2024 by Saurenergy Bihar, one of the renewable deficit regions in India is now working on alternative plans to boost its renewable energy mix. The state has now pinned hopes on the potential of its water bodies to generate electricity. The eastern Indian state which already has worked to develop floating solar plants in Darbhanga and Supaul high […] Read more
Everything You Wanted To Know About India’s Biggest Rooftop Solar Scheme Updated On Fri, Apr 19th, 2024 by Saurenergy Made For, Of and By India One of the biggest aspects of the PM Surya Ghar Scheme is the focus on mass markets, by limiting subsidies to systems upto 3kW in size. It is also meant to be a catalyst for India’s domestic manufacturing base for solar equipment, which has struggled to counter Chinese imports […] Read more
Avaada Energy Wins 250 MW Solar-Wind Hybrid Project From NTPC Updated On Thu, Apr 18th, 2024 by Saurenergy Indian renewable energy company Avaada Energy recently announced winning a 250 MW solar-wind hybrid power project in a tender issued by the National Thermal Power Corporation (NTPC). Earlier, NTPC had issued a tender for the selection of hybrid power generators to supply 1000 MW of power through ISTS-connected wind-solar hybrid projects. Avaada Energy secured a 50 […] Read more
PM Surya Ghar: MNRE Proposes Rating Of Rooftop Solar Vendors Updated On Tue, Apr 16th, 2024 by Saurenergy The Ministry of New and Renewable (MNRE) today published the draft guidelines under the newly announced PM Surya Ghar Muft Bijli Yojana. The new draft norms proposed the concept of rating the vendors installing rooftop solar systems for the residential consumers. The ministry said that the vendors would be rated based on the feedback of […] Read more
Elin Energy Begins Solar Manufacturing Facility In US Updated On Tue, Apr 16th, 2024 by Saurenergy Elin Energy, the European PV panel maker, has announced the commissioning of its first manufacturing facility in the United States. Elin is currently leasing the site in Twinwood Business Park from Welcome Group, a Houston-based leader in single-tenant real estate development and property management. Production began on March 5. The facility will produce only modules. […] Read more
Mishap At Omkareshwar Brings Forth Worries On Large Floating Solar Projects Updated On Tue, Apr 16th, 2024 by Saurenergy The pictures, and videos of the damage caused at India’s largest floating solar plant, at Omkareshwar in Madhya Pradesh, have brought forth a range of worries about the issues involved with floating solar, besides the best way to resolve them. The answer lies in better research and transparency about these projects., considered critical to regional […] Read more
European Commission Signs Solar Charter To Boost Manufacturing Resilience Updated On Tue, Apr 16th, 2024 by Saurenergy The European Commission has signed the European Solar Charter to support Europe’s solar manufacturing base. In the charter, the signatories commit to the support of Europe’s solar manufacturing base. The charter was signed in Brussels and was drafted by the European Commission. Last year, 56 GW of solar PV were installed in the European Union […] Read more
IOCL Floats Tender For Multiple Solar PV Projects Across India Updated On Fri, Apr 12th, 2024 by Saurenergy Indian Oil Corporation Limited (IOCL) has released a tender for rooftops and spare land at various locations spread all over India for the installation of Solar Photo Voltaic (SPV) Plants and to maximise production and utilization of Renewable Energy through these SPV Plants. The IOCL company invited applications by Expression of Interest document, (EoI). It […] Read more
News In Brief April 5- Alpex Solar, SolarEdge, Ford & More.. Updated On Fri, Apr 5th, 2024 by Saurenergy Alpex Solar bags govt orders worth Rs. 11.90 crore in Jharkhand under the PM-KUSUM scheme Alpex Solar says it has received orders for supply, installation and commissioning of 500 Solar Water Pumping Systems from Jharkhand Renewable Energy Development Agency. The Projects are scheduled to be completed within 120 days from the date of issue of work […] Read more