Case Study: Demand Flexibility for Swift Transition to Renewable Updated On Mon, Oct 17th, 2022 by Saurenergy Demand flexibility is the capacity of demand-side loads to change their consumption patterns hourly or on another timescale. It can help make electricity more affordable by helping customers use less power when prices are high. The research community claims that Demand flexibility will play a key role in reaching high levels of renewable generation and […] Read more
Engineer- Waste and Products Management Updated On Mon, Oct 17th, 2022 by Saurenergy The primary responsibility of this job is to plan and supervise the scheduling of daily work assignments of all Waste/Recycling Product Collection and Management personnel. Responsible for training and developing direct reports. Shall provide clear direction to associates, contractors, and vendors to ensure that First Solar’s standards are being met. Responsible for communicating objectives, systems, […] Read more
Ampyr, Shell Energy Collaborate for 1,000 MWh BESS Updated On Mon, Oct 17th, 2022 by Saurenergy Ampyr Australia Pty Ltd has announced that it has signed an agreement with energy conglomerate Shell Energy Australia to jointly develop a proposed battery energy storage system strategically located in Wellington called ‘the Wellington BESS’ in Central West New South Wales. Ampyr informed that the target capacity of the Wellington BESS is 500 MW/1,000 MWh […] Read more
Pennar Industries Wins EPC Contract For NTPC’s 500 MW Project At Bhadla Updated On Fri, Oct 14th, 2022 by Saurenergy Pennar Industries Limited (PIL) has informed us that it has won the EPC contract against its bid for a major solar project at Bhadla, Rajasthan. The project by NTPC Renewable Energy Limited (NTPC REL) is its proposed 500 MW AC / 625 MW DC Solar PV project at Bhadla, Rajasthan. PIL has emerged as the […] Read more
Madhya Pradesh Eyes 50000 Cr Investment for RE Segment by 2027 Updated On Fri, Oct 14th, 2022 by Saurenergy Recently, Madhya Pradesh Government published the new renewable energy policy titled “Madhya Pradesh Renewable Energy Policy – 2022.” Madhya Pradesh government indicates investing Rs 15,000 crore and Rs 50000 crore for RE (renewable energy) generation industry. The state government plans to build four thousand (4,000) MW of renewable energy projects in the open access solar […] Read more
Cummins to Build Gigawatt Electrolyzer Manufacturing Facility in Spain Updated On Fri, Oct 14th, 2022 by Saurenergy The US-based power technology provider Cummins Inc. has said that it will soon start building its new gigawatt electrolyzer manufacturing plant in Guadalajara, Castilla-La Mancha, Spain to expanding the green hydrogen economy in Europe and globally. In 2021, Cummins had selected Spain as the site of a new proton exchange membrane (PEM) electrolyzer plant. Earlier […] Read more
EE North America To Develop 10 GW Of RE Projects In US By 2026 Updated On Thu, Oct 13th, 2022 by Saurenergy EE North America has announced its ambition to develop 10 gigawatts (GW) of renewable energy in the United States by 2026. It claims to be a market leader in the development of solar, wind and Power-to-X projects, which can produce green hydrogen, e-methanol and jet fuel. EE North America is a subsidiary of the Copenhagen-based […] Read more
Mainstream, Aboitiz Power Make Joint Venture For 90 MW Wind Project in Philippines Updated On Thu, Oct 13th, 2022 by Saurenergy Global clean and renewable energy player Mainstream Renewable Power has announces the signing of a joint venture agreement with Aboitiz Power Corporation via its subsidiary Aboitiz Renewables to initially deliver the 90 MW Libmanan onshore wind project that is located in the Camarines Sur Province of Philippines. Mainstream Renewable Power is a global renewable energy […] Read more
233 GW of Additional Transmission Capacity Mooted By 2030 Updated On Thu, Oct 13th, 2022 by Saurenergy The Ministry of Power announced recently that the government is considering energy transmission across the nation for renewable energy with a capacity of up to (adding) 233 GW, at the latest by 2030. “Planning of transmission strategy for integration of further 52 GW imaginable REZ (renewable energy zone) by 2026–27 person has been carried out […] Read more