Executive (Consultancy) for Engineering- 01 Post for 03 Years Updated On Wed, Jul 28th, 2021 by Saurenergy Executive Jobs 2021 in New Delhi – NTPC is looking for experienced professionals for its Commercial Function, Consultancy Wing, Business Analysis, Solar PV, CS, Corporate Communication and Clean Technologies area for specific period as per details given below: Qualification: B.E/B.Tech in Mechanical Engineering with at least 60% marks from a recognized University/Institution. Experience Requirement: Minimum 03 […] Read more
With India’s Renewable Power Capacity Battle Won, Is It Time To Focus On Generation? Updated On Wed, Jul 28th, 2021 by Saurenergy In response to a query in the ongoing monsoon session of parliament, Power and MNRE Minister R.K. Singh informed the house that India’s renewable energy capacity, including installed, under installation and being tied up, stands at almost 97 GW as of June 30, 2021. This mix includes solar, wind, biomass and small hydel. Add to […] Read more
Lohum Plans Integrated Li-Ion Unit f 3 GWh/3000 MWh At Gr. Noida Facility Updated On Wed, Jul 28th, 2021 by Saurenergy LOHUM, positioned as the world’s leading integrated lithium-ion battery player, has announced that it will set-up 3GWh capacity single-location integrated Li-ion battery manufacturing and recycling factory in Greater Noida, Uttar Pradesh within the next 18 months. The integrated factory will have the battery manufacturing capacity of 1 GWh/ 1,000 MWh and 2GWh/ 2,000 MWh of […] Read more
Hitachi ABB Power Grids Commissions UHVDC Transmission Link in India Updated On Wed, Jul 28th, 2021 by Saurenergy Hitachi ABB Power Grids in India has announced the successful commissioning of one of India’s longest ultra-high voltage direct current (UHVDC) transmission links for Power Grid Corporation of India Limited. A +/-800 kilovolt (kV), 6,000MW transmission link that connects Raigarh, Chhattisgarh, with Pugalur, Tamil Nadu, and stretches over 1,800 kilometers. Notably, this transmission link can […] Read more
Net Metering for Systems Up to 500 kW Proposed In Draft Karnataka Regulations Updated On Tue, Jul 27th, 2021 by Saurenergy In what should be a relief for solar developers, the Karnataka Electricity Regulatory Commission (KERC) has brought up a proposal that revises the limits for net metering to 500 kW from the earlier proposed 10 kW. In the new proposal, the KERC had suggested generic tariffs of Rs. 3.82/kWh for residential rooftop solar systems between […] Read more
Equinor, RES & Green Giraffe Partners for Floating Offshore Wind in France Updated On Tue, Jul 27th, 2021 by Saurenergy Equinor, RES, and Green Giraffe join forces and form Océole, a partnership dedicated to developing floating offshore wind in France. Océole will evaluate and work towards submitting bids in the upcoming floating offshore wind tenders held by the French government. Establishing this partnership is in line with the three companies’ ambition of delivering high-performance floating offshore […] Read more
RWE Builds Hydropower Coupled 117MW Battery Storage Systems in Germany Updated On Tue, Jul 27th, 2021 by Saurenergy Essen-headquartered German multinational energy company, RWE has announced the construction of one of the largest and most innovative battery energy storage systems (BESS) in Germany. The BESS is coupled with the existing run-of-river hydroelectric power plants. The battery systems will be spread across two locations, as the company said that it will install a total […] Read more
Wind Developers in Maharashtra Find Limited Support at APTEL Updated On Tue, Jul 27th, 2021 by Saurenergy The Appellate Tribunal for Electricity (APTEL) has ruled in favour of a petition filed by the Wind Independent Power Producers Association (WIPPA), challenging the process by which e-public hearing was conducted by the Maharashtra Electricity Regulatory Commission (MERC) on July 16, 2021. The petitioner filed its petition under Section 121 of the Electricity Act, 2003, […] Read more
Waaree Completes 300 MW Production for US Order Updated On Tue, Jul 27th, 2021 by Saurenergy Waaree Energies Ltd., the over Rs 2000 crore Mumbai-based solar manufacturing firm has completed the production of 300+ MW solar modules for Aquamarine, a 250-MW solar photovoltaic project that is part of the first phase of Westlands Solar Park (WSP) in California’s San Joaquin Valley. WAAREE has provided 385, 390 Wp Mono PERC Solar PV […] Read more