Manager- Engineering Manufacturing Updated On Thu, Dec 1st, 2022 by Saurenergy The incumbent under limited supervision is responsible for the management of the Sustaining and Alignment Engineering functions of the Deposition and Thermal team. This position provides engineering support and solutions to ensure the Deposition and Thermal processes maintain their Plant baseline for Product Performance (Efficiency, Stability, Durability), Manufacturing Yield and Throughput in a cost efficienct […] Read more
L&T Picks LONGi for Saudi Projects With 1292 MW Module Order Updated On Thu, Dec 1st, 2022 by Saurenergy L&T has picked Chinese major LONGi to provide 1292MW of PV modules for two solar projects under construction in Saudi Arabia. LONGi VP Dennis She and A. Ravindran, Senior Vice President and Head of the Renewables Strategic Business Group at L&T, jointly signed the agreement, involving two Saudi Arabian projects for which L&T is acting […] Read more
GEDA Floats Tender for Setting Up 40 Electric Vehicle Charging Stations Updated On Thu, Dec 1st, 2022 by Saurenergy The commissioning, operation, and maintenance of 40 electric vehicle (EV) charging stations at various places around Goa are being solicited by the Goa Energy Development Agency (GEDA). Through the Faster Adoption and Manufacturing of Hybrid and Electric Vehicles (FAME II) program, the charging stations will be installed on a design, build, operate, finance, and transfer […] Read more
Pune Municipal Floats Tender for Setting Up EV Charging Stations Updated On Thu, Dec 1st, 2022 by Saurenergy Pune Municipal Corporation (PMC) is looking for suggestions regarding the positioning, operation, and maintenance of public EV charging stations. There are 92 locations in PMC-owned parking lots, gardens, hospitals, and auditoriums where charging stations can be installed. The commissioning of the charging stations will be done through a public-private partnership model. The last date for […] Read more
Within 6 Months, We will be Expanding Our Module Capacity to 400 MW Updated On Wed, Nov 30th, 2022 by Saurenergy AT REI 2022 in Greater Noida’s Expo Centre, India’s renewable energy majors were present in strength this year. Saur Energy caught up with (Ashwin Patel, Managing Director, Credence Solar) to know more about their plans and expectations. Read more
Volkswagen’s Aurangabad Factory Adopts 100% Renewable Electricity Updated On Wed, Nov 30th, 2022 by Saurenergy By 2025, German motor vehicle manufacturer, the Volkswagen Group, hoped to have used only green energy (100% Renewable Electricity) at its Aurangabad site. Three years earlier than anticipated, the German automotive giant has already used only renewable energy at its Aurangabad production facility. In 2018, Skoda Auto Volkswagen India Private Limited (SAVWIPL) ordered the installation […] Read more
Influence of Azimuth and Tilt on Yield of PV System Updated On Wed, Nov 30th, 2022 by Saurenergy Background The tilt and azimuth of a solar panel have a great influence on the energy yield of the overall system. The same panel, at the same installation site, can have different azimuth or tilt. This is a topic we are often asked about so in this Solis seminar, we explore the subject further. About […] Read more
FIMER’s EV Charger Now Compatible With Noodoe’s EV Charging CMS Updated On Tue, Nov 29th, 2022 by Saurenergy The Italian solar inverter maker FIMER’s FLEXA AC Wallbox EV charger and Noodoe EV, a provider of EV charging stations, has completed integration testing of Noodoe EV’s charger management software (CMS). Because of their presence in North America, Europe, Australia, Asia, and the Middle East, EV charging operators and business owners can easily set up […] Read more
Glass Maker Saint Gobain Strikes RE Deal For Operations in Spain Updated On Tue, Nov 29th, 2022 by Saurenergy Worldwide light and sustainable construction giant Saint-Gobain has announced that the company has signed a Power Purchase Agreement (PPA) with Endesa in Spain for the supply of clean energy. Endesa is the top energy supplier in Spain. The official statement of Saint-Gobain held that the 11-year agreement will start in 2024 and will cover around […] Read more