IEX June Update- Prices Hold Steady As Demand Rises Updated On Wed, Jul 3rd, 2024 by Saurenergy Indian Energy Exchange (IEX), India’s premier electricity exchange, achieved electricity volume of 10,185 MU in June’24, marking a 24.7% year on year increase. The total monthly volume including certificates at 10,677 MU, increased 19.4% on year-on-year basis. For the first quarter of the fiscal year 2025, IEX achieved electricity volume of 28,178 MU, an increase […] Read more
Mangal Singh Brothers Private Limited Updated On Tue, Jul 2nd, 2024 by Saurenergy Mangal Singh Brothers Private Limited (also known as “MSB”) is the Market Leader in Timing Belts, V Belts, Flat Belts and Timing Pulleys across India. Having operated in this segment since 1970’s, we are associated with Top Quality Brands from Japan and Europe. MSB is capable to catering to wide range of application in various […] Read more
Govt Proposes Timelines For Activating EV Charging Connections Updated On Tue, Jul 2nd, 2024 by Saurenergy The Ministry of Power has now issued a new draft notification to expedite the growth of installation of electric vehicle charging stations. The ministry has also specified a minimum time period for the electricity distribution companies (discoms) to supply electricity connections to the EV charging points/stations which goes to as low as three days for […] Read more
DhaSh PV Prepares For Next Stage OF Growth With 50 GW Manufacturing Expansion Updated On Tue, Jul 2nd, 2024 by Saurenergy Bengaluru-based DhaSh PV Technologies Limited, India’s largest Integrated PV Junction Box Manufacturer, has broken ground on its ambitious INR 346.35 crore investment project in the Sira Industrial Area, Tumkur, Karnataka. Spread over an area of almost 20 acres, this project is the biggest expansion from the integrated PV equipment supplier. A state-of-the-art manufacturing plant dedicated […] Read more
Waaree Receives 900 MW Order From Serentica For Project In Rajasthan Updated On Mon, Jul 1st, 2024 by Saurenergy Mumbai-based Waaree Energies Ltd., India’s largest solar PV modules manufacturer with an aggregate installed capacity of 12 GW as of June 30, 2023 has received a 900 MW module supply deal from Serentica Renewables India Private Limited. Waaree Energies received this contract for a project located in Fatehgarh, Jaisalmer, Rajasthan, India. This project is expected […] Read more
Lead Designer-Panel and Switchboard Updated On Mon, Jul 1st, 2024 by Saurenergy Lead Designer will be responsible for interpreting detailed non-standard switchboard product customer requirements and translating them into the final design package for the shop floor for smoother manufacturing of customized switchboard as a product. Contact field sales and/or the end customer or Consulting Engineer as required to ensure accurate interpretation of the intent of the […] Read more
NTPC-REL Launches Tender For 1200 MW Hybrid Project Across India Updated On Mon, Jul 1st, 2024 by Saurenergy National Thermal Power Corporation Renewable Energy (NTPC-REL), has released a tender, inviting bids for the selection of hybrid power generators on Build Own Operate basis. This project is undertaken to supply 1200 MW of power from ISTS-Connected wind-solar hybrid power projects anywhere in India. the last date for submitting bids is August 7, 2024. The […] Read more
Loan Sanctions Up 383%, Disbursements 68% For IREDA In Q1 2024-25 Updated On Mon, Jul 1st, 2024 by Saurenergy Indian Renewable Energy Development Agency Ltd. (IREDA) has reported a strong performance for the first quarter ended 30th June 2024. According to provisional figures, subject to audit, the company recorded substantial increases in loan sanctions, disbursements, and its loan book. The renewables focused firm, which has also been the preferred nodal agency for many key […] Read more
MEDA Invites EoI To Build 10 MW Rooftop PV System On Gov Buildings Updated On Fri, Jun 28th, 2024 by Saurenergy Maharashtra Energy Development Agency (MEDA) a state nodal agency under the Ministry of New and Renewable Energy (MNRE) recently released a tender inviting to set up 10 MW grid-connected rooftop solar PV systems. This project falls under RESCO mode on government sector buildings terraces. MEDA in its tender invited bids to discover tariffs for rooftop […] Read more