Rajasthan’s Struggles With PM Surya Ghar Scheme Updated On Fri, Nov 8th, 2024 by Saurenergy Despite being known for its high solar irradiation and hosting India’s largest solar park, Rajasthan seems to be struggling with the implementation of the PM Surya Ghar scheme. The slow pace of installations since the scheme’s launch has affected the state’s reputation as a leader in renewable energy. This underperformance is in stark contrast to […] Read more
Civil Engineer (Power) Updated On Fri, Nov 8th, 2024 by Saurenergy This individual will be the Civil Engineer on a multi-disciplinary design team at a successful and growing company. Be part of a high-performance group focusing on emerging power plant-based reciprocating engine/Battery storage/Solar technology that’s being adopted across the U.S. and the globe. Civil Engineer will work on an integrated design team within our Power Global […] Read more
RE Push Can Lead To 24% Dip In Coal Power Generation By 2030: CEEW Study Updated On Fri, Nov 8th, 2024 by Saurenergy India’s current climate policies are already helping bend its long-term emissions curve and are projected to reduce CO2 emissions by almost 4 billion tones between 2020 and 2030, a latest report from the Council on Energy, Environment and Water (CEEW) said. This reduction is equivalent to nearly 1.6 times the European Union’s CO2 emissions in […] Read more
RRUVNL Launches Rajasthan’s First BESS Tender For 1000MWh Updated On Thu, Nov 7th, 2024 by Saurenergy To meet its expanding energy needs, Rajasthan’s state power generation company, Rajasthan Rajya Vidyut Utpadan Nigam (RRUVNL), has announced its first standalone Battery Energy Storage System (BESS) tender. This 500 MW/1000 MWh tender, which includes a greenshoe option, will be developed across six locations: Giral Lignite Power Project in Barmer; Suratgarh Thermal Power Station; RVPNL […] Read more
Senior Engineer – Program Management (NPI) Updated On Thu, Nov 7th, 2024 by Saurenergy The Senior Engineer – Program Management (NPI) position will be based in Hyderabad, India. In this position, you will report to the Senior Manager – Program Management and will be responsible for facilitating Nextracker’s Product Development. He/she ensures that Nextracker’s products and installation out-perform customer expectations, are of the highest quality possible, and develops customer […] Read more
Grid Compliance Specialist Updated On Thu, Nov 7th, 2024 by Saurenergy Systems engineering is a cross-functional engineering discipline centered on an approach, mindset, and process. All activities that consider both the business and the technical needs of the customers with the goal of providing a quality product that meets the user’s needs. The discipline that executes a robust process of design, creation, and optimization of systems, […] Read more
Green Stocks Nov 7: Stocks Dragged Down With Market Updated On Thu, Nov 7th, 2024 by Saurenergy Market gyrations caught up with green sticks yet again, as most slipped along with the broader market. The standouts were solar glass maker Borosil Renewables and Shakti Pumps, which hit the upper circuit today. With most results out of the way, it is clear that many in the markets believe that upsides in green stocks […] Read more
Renewable Independent Engineering Senior Consultant Updated On Thu, Nov 7th, 2024 by Saurenergy Accountabilities:- Technical due diligence, techno-economic viability, feasibility studies, detailed project reports covering review of technology, design, contracts, infrastructure, permits and clearances, land area analysis, risk analysis, financial model. Should have strong knowledge of Contracts and Agreements for the development of Solar or Wind Power Projects. 8 to 10 years of technical consulting, lenders, buyers, sellers […] Read more
Rajasthan Discom Issues Tender Under PM-KUSUM (Component-A) Updated On Thu, Nov 7th, 2024 by Saurenergy In a bid to expand the growth of solar power under PM-KUSUM, the Ajmer Discom, Ajmer Vidyut Vitran Nigam (AVVNL) has issued a tender, inviting proposals from interested applicants to set up decentralized solar power plants with capacities from 0.5 MW to 2 MW, to be connected to 33/11 kV substations as identified by Ajmer […] Read more