HSSE Specialist – Construction (Renewables) Updated On Mon, Dec 16th, 2024 by Saurenergy Partake in the development/modification of Transmission HSSE guidelines & procedures in line with overall Apraava policies and regional HSSE regulations by providing required inputs to the Head – HSSE (RE) Draft weekly, monthly, and annual HSSE statistics reports for the construction site detailing all safety incidents basis data from employees, O&M and OEM contractors and […] Read more
Prakash Chand Garg Joins NSEFI As Its New Principal Advisor Updated On Mon, Dec 16th, 2024 by Saurenergy The National Solar Energy Federation of India (NSEFI), an industry body representing India’s renewable energy sector, has appointed Prakash Chand Garg as NSEFI’s new Honorary Principal Advisor. PC Garg’s illustrious career spans over 37 years in the power sector, during which he has held diverse and impactful roles. In his long career, he has contributed […] Read more
JSW Achieves 3.1 GW Of Locked-In RE Generation Capacity Updated On Mon, Dec 16th, 2024 by Saurenergy Mumbai-based JSW Energy announced securing multiple renewable energy (RE) projects in the Commercial and Industrial (C&I) power market. With this latest project, JSW achieved a total locked-in power generation capacity of 20 GW. The company’s locked-in renewable energy (RE) C&I capacity now stands at 3.1 GW. This includes 2,654 MW of JSW group captive capacity […] Read more
Engineering Program Coordinator Updated On Fri, Dec 13th, 2024 by Saurenergy The Engineering Program Coordinator will be based in Hyderabad. In this position, you will report to the Senior Manager, Program Management. The candidate will work with mechanical engineering product development team to support program scope, schedule, and cost. They will be responsible for ensuring that program documentation and infrastructure are available for the cross functional […] Read more
Assistant Manager Engineering Program Management Updated On Fri, Dec 13th, 2024 by Saurenergy The Assistant Manager, Engineering Program Management will be based in Hyderabad. In this position, you will report to the Senior Manager, Program Management. The candidate will work with mechanical engineering product development team to manage program scope, schedule, and cost. He will be responsible for ensuring that program process is followed and cross functional support […] Read more
Manager – Lead OEM Coordinator Updated On Thu, Dec 12th, 2024 by Saurenergy We are seeking an accomplished Renewable Energy SCADA expert with a strong technical background in IT networking, firewalls, and operational technology (OT) security. As the SCADA expert, you will be responsible for the end-to-end management of SCADA systems, emphasizing cybersecurity, network resilience, and the seamless integration of OT and IT environments within renewable energy projects. […] Read more
India Adds 14.9 GW Of New RE Capacities In 8 Months Of FY25 Updated On Thu, Dec 12th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) published the latest data on new renewable energy capacity additions in early December. The data revealed that the country added a total of 14.9 GW of new renewable energy capacities (excluding hydro) in the current financial year (till November 2024). According to the report, India’s solar energy […] Read more
Chief of Unit, Resource Mobilisation Updated On Tue, Dec 10th, 2024 by Saurenergy Reporting to the Assistant Director-General (Programs) or a designated officer, this role will lead a team of professionals – International and National Officers. The Chief will provide expert advice, develop policies, and lead resource mobilization and fund-raising efforts. S/he will lead the financing, and capital/investment flows that will meet ISA’s mandates in implementing solar projects/initiatives […] Read more
SECI’s 4 GWh BESS Tender Finds Takers At Rs 3.52/kWh Updated On Tue, Dec 10th, 2024 by Saurenergy NTPC Renewable Energy, Sembcorp Green Infra, Solarcraft Power India 8 and Hero Solar Energy have all bid at Rs 3.52 to emerge winners from SECI’s largest Solar+Storage tender till date for 2 GW Solar plus 4 GWh BESS. While NTPC won 500 MW, Hero walked away with 270 MW, with the rest getting 150MW allotments […] Read more