Sungrow Aims For Large Share Of Residential, Storage Segments in 2025 Updated On Thu, Jan 2nd, 2025 by Saurenergy Sunil Badesra, Country Head (India and South Asia) for Global inverter leader Sungrow has reason to feel satisfied. Not only has the firm had a stellar 2024 in India, but the future looks even more promising thanks to the strong demand in the market, and a lineup of product offerings from Sungrow India. New launches […] Read more
Top 5 Trends Shaping the Global Wind Power Industry in 2025 Updated On Tue, Dec 31st, 2024 by Saurenergy The year 2025 is expected to witness the record growth of renewable energy following the uptick in wind power market from the preceding year. Going by the trends in motion, the global wind energy capacity addition is set to double and reach over 700 GW by as early as 2028, compared to 2022 levels. New […] Read more
PM Surya Ghar: 6 Out Of 1736 Vendors In UP Rated A++ Updated On Mon, Dec 30th, 2024 by Saurenergy The Uttar Pradesh New and Renewable Energy Agency (UPNEDA) has released the draft list of empanelled rooftop solar vendors. The list also includes the ratings these vendors received on the National Rooftop Portal based on their installations. The final ratings for vendors will be published monthly, starting in January 2025. UPNEDA reports that the state […] Read more
Servotech Secures Rs. 31 Cr Order To Supply 1100 Agriculture Pumps To UPNEDA Updated On Mon, Dec 30th, 2024 by Saurenergy Delhi-based Servotech Renewable Power System Ltd. (Formerly known as Servotech Power Systems Ltd.), a solar solutions and EV Charger manufacturer has secured an order approx. 1100 Grid-connected Agriculture Pumps under “KUSUM Component C-1 Scheme” from Uttar Pradesh New and Renewable Energy Development Authority (UPNEDA), Govt. of Uttar Pradesh. The project valued at around 31 Crores […] Read more
SECI Floats 125 MW/500 MWh BESS Tender in Kerala With VGF Updated On Thu, Dec 26th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) recently released a tender to set up a 125 MW/500 MWh standalone Battery Energy Storage System (BESS) in Kerala with Viability Gap Funding (VGF) support. The last date for bid submission is set as February 6, 2025. This marks the 22nd standalone BESS tender in India. This is […] Read more
News Briefs- Sungrow’s PowerTitan 2.0 In Greece, Longroad-META Deal, Repowering Wind In Germany Updated On Thu, Dec 26th, 2024 by Saurenergy Sungrow’s PowerTitan to Power 105MWh Storage Projects In Greece Sungrow, the world’s leading provider of photovoltaic inverters and energy storage systems, has entered a strategic partnership with KTISTOR Energy for the implementation of its PowerTitan 2.0 liquid-cooled battery energy storage system (BESS) in several key projects in Greece. Four key energy storage projects in northern […] Read more
Livguard Unveils Integrated Drivetrain Solutions At EV Expo 2024 Updated On Mon, Dec 23rd, 2024 by Saurenergy Haryana-based Livguard, under the SAR Group, unveiled Integrated Drivetrain Solutions at the EV Expo 2024 in Delhi. This comprehensive solution includes critical components such as the motor, controller, battery, and charger, specifically designed for electric two-wheelers, e-rickshaws, and L5 vehicles (e-autos). By consolidating all key drivetrain components under one roof, Livguard ensures seamless compatibility and […] Read more
Assistant Manager Updated On Fri, Dec 20th, 2024 by Saurenergy Responsibilities:- Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve Solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Lender’s Engineer – Renewables Updated On Thu, Dec 19th, 2024 by Saurenergy Capable of handling the project related to solar, wind, battery energy storage system (BESS) as a project manager and will be responsible for all the internal and external communication related to the Project. Overview and In-depth knowledge of wind, solar and BESS projects. Capable of handling Owners Engineering (Review of Design Documents), Detailed engineering design […] Read more