SECI Issues Tender To Build 1000 MW/2000 MWh BESS Updated On Thu, Jun 27th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has issued a tender inviting bids to set up 1000 MW/2000MWh (1000 MW x 2 hrs) standalone battery energy storage systems (BESS) in India. This project was issued under tariff-based global competitive bidding (ESS-2). The tender follows a new push for large battery storage systems in the country […] Read more
Juniper, SECI Sign PPA For 150 MW Hybrid Project In Two States Updated On Wed, Jun 26th, 2024 by Saurenergy Delhi-based Juniper Green Energy, a renewable energy power producer signed two Power Purchase Agreements (PPAs) with SECI for a 150 MW hybrid project in Gujarat and Rajasthan. This wind-solar hybrid power project is to be developed under Hybrid Tranche VII in Gujarat and Rajasthan. This collaboration aims to generate approximately 477 million units (MUs) […] Read more
Govt’s New Scheme To Aid In Evacuating RE From Rajasthan, Karnataka Updated On Mon, Jun 24th, 2024 by Saurenergy The Union government has now approved new Inter-State Transmission System (ISTS) schemes to evacuate 9 Gigawatt (GW) of renewable energy (RE) from the renewable rich states of Rajasthan and Karnataka. These schemes will be implemented through Tariff-Based Competitive Bidding (TBCB) mode. These schemes are part of the government’s 500 GW renewable energy capacity by 2030 […] Read more
Lead- Warehouse Operations and Materials Updated On Fri, Jun 21st, 2024 by Saurenergy Develops a globally aligned warehouse strategy for the site to drive a lean, efficient warehouse covering BOM, Spares, Consumables and Finished Goods. This includes driving an efficient and effective distributions of parts mentioned above between sites, which is cost effective. Responsible for the overall performance of the warehouse and inventory control functions; includes FG shipments, […] Read more
Smarter E AWARD – Photovoltaics Category 2024 Winners Announced Updated On Fri, Jun 21st, 2024 by Saurenergy The Smarter E AWARD 2024 has been announced, celebrating a new set of winners who are transforming the dynamics of energy and mobility through their innovative products and solutions. The Smarter E AWARD seeks to honour concepts and technologies that contribute to a 24/7 renewable energy supply. The award encompasses five categories: Photovoltaics, Energy Storage, […] Read more
Waaree Energies Secures 280 MW Order From Mahindra Susten Updated On Thu, Jun 20th, 2024 by Saurenergy Waaree Energies Limited, an Indian solar PV module manufacturer with an aggregate installed capacity of 12 GW, as of June 30, 2023 (Source: CRISIL Report), signed an agreement with Mahindra Susten. This agreement with renewable independent power producer (IPP), was undertaken to supply 280 MW (DC) of advanced solar modules in Bikaner, Rajasthan. The contract […] Read more
JSW MG Motor India Partner Ecofy For EV Financing Updated On Thu, Jun 20th, 2024 by Saurenergy JSW MG Motor India have announced that it partnered with Eversource Capital-backed NBFC Ecofy to provide financing and leasing solutions for its electric vehicles. According to a release, the two businesses have inked a Memorandum of Understanding (MoU) under which Ecofy will offer leasing and financing options for up to 10,000 JSW MG EVs over […] Read more
Associate Tech Lead – Electrical Engineering Updated On Thu, Jun 20th, 2024 by Saurenergy Associate Tech Lead will work as part of the Electrical Engineering team and have responsibility for the design and development of Electrical Subsystems for various product lines (New Product Developments (NPD), Quality improvement and Productivity projects). The role will have strong focus on new technologies, processes and applying these technologies to various product lines. Responsibilities:- Design […] Read more
Cabinet Approves Viability Gap Funding For Offshore Wind Updated On Thu, Jun 20th, 2024 by Saurenergy The Indian Union Cabinet chaired by Prime Minister Narendra Modi recently approved the Viability Gap Funding (VGF) scheme for offshore wind energy projects. The total outlay of the scheme stood at Rs 7,453 crore. The fund included an outlay of Rs 6,853 crore for the installation and commissioning of 1 GW of offshore wind energy […] Read more