Narendra Modi Flags Off First Ever Diesel to Electric Locomotive Updated On Tue, Feb 19th, 2019 by Saurenergy Diesel Locomotive Works has converted two WDG3A Diesel Locos into a Twin Electric WAGC3 loco of 10,000 HP. Prime minister Narendra Modi has flagged off the world’s first ever diesel to electric converted locomotive at the Diesel Locomotive Works in Varanasi. The Prime Minister unveiled the first of its kind converted electric locomotive during his […] Read more
Review of a PV Plant Featuring Single-Axis Trackers Updated On Tue, Feb 19th, 2019 by Saurenergy Soltec, a leading manufacturer and supplier of single-axis solar trackers and related services in large-scale projects, supplied 162 MW of complete tracker equipment to a PV power plant located in Northeast Brazil. The project counts with 5,368 units of the innovative independent-row tracker. Eliminating array-gaps at all pile mounting locations, SF7 achieves complete tracker module […] Read more
Innovation, Cooperation, and More at SECI’s Pre-Bid Meet for 7.5GW Leh-Kargil Tender Updated On Mon, Feb 18th, 2019 by Saurenergy At the pre-bid meeting called by SECI for the massive 7.5GW Leh-Kargil tender, interested bidders and a whole lot of other curious people turned up to know more. Pre-bid meetings for large projects are usually a place to get the nitty-gritty sorted and out of the way. Or in some cases, obvious mistakes or conditions […] Read more
Tender For 6.8 MW Wind Power Plant Issued in Daman & Diu Updated On Mon, Feb 18th, 2019 by Saurenergy The last date of bid submissions is April 22, 2019, the technical bods opening will take place on April 23, 2019, and price bid opening on April 30, 2019. The electricity department of Daman on behalf of the President of India has invited tenders from reputed manufacturers/EPC contractors for setting up of 6.8 MW of […] Read more
PM Dedicated Rs 4,976 Cr Transmission Project to the Nation Updated On Sat, Feb 16th, 2019 by Saurenergy The Power Ministry claimed in a statement that, this Rs 4,976 crore project will improve the power system in Western UP along with Bundelkhand. With an aim to improve the power system, Prime Minister Narendra Modi dedicated PowerGrid 765/400 kV Orai Sub-station & 765 kV Aligarh Sub-station and associated lines to the Nation at a […] Read more
Work Begins on Adani’s 100% RE Data Centre Updated On Fri, Feb 15th, 2019 by Saurenergy The centres with a 5 GW solar park would be a first-of-its-kind 100 percent renewable energy powered project in the world. Andhra Pradesh Chief Minister N. Chandrababu Naidu on Thursday laid the foundation stone for Data Centre and Technology Park of Adani Group in the port city of Vizag. The ground-breaking ceremony for the facility coming up at Kapuluppada […] Read more
PPA For 250 MW Wind Farm Signed in Egypt Updated On Thu, Feb 14th, 2019 by Saurenergy The project will produce more than 1000GWh a year, powering the equivalent of over 350,000 homes in Egypt. Lekela, the renewable power company that delivers utility-scale projects across Africa, has signed a power purchase agreement (PPA) with the Egyptian Electricity Transmission Company (EETC) for its 250MW wind farm project in the Gulf of Suez, near […] Read more
SECI Awards 840 MW of its 1200 MW Hybrid Tender Updated On Thu, Feb 14th, 2019 by Saurenergy SECI will now enter into a PPA with the two selected project developers for a period of 25 years. The Solar Energy Corporation of India (SECI) has issued the results of its 1200 MW ISTS-connected wind-solar hybrid power projects (Tranche-I) tender. Two bidders, SBE Renewable Ten Private Limited and Mahoba Solar Private Limited were awarded a […] Read more
HPL Electric and Power Ltd Reports Q3 FY 19 Results Updated On Thu, Feb 14th, 2019 by Saurenergy PAT for the first nine months of FY19, was stable. HPL Electric and Power Ltd, an established electric equipment manufacturing company in India, manufacturing a diverse portfolio of electric equipment, has announced its financial results for the quarter ended December 31, 2018. Financial Performance in the first nine months of the financial year 2018-19, was […] Read more