TPEML, Tata Renewable Tie Up For Boosting Solar Adoption Updated On Tue, Aug 6th, 2024 by Saurenergy Tata Passenger Electric Mobility Ltd. (TPEML) and Tata Power Renewable Energy Ltd. (TPREL), have joined hands to drive zero-emissions mobility in India through a combined solution of Electric Vehicles and Solar Rooftop Systems. Through this collaboration, TPEML will enable customers to get a solar rooftop system installed. Both the companies will promote EVs / EV […] Read more
Inox Wind Secures Latest 201 MW Order From Integrum Energy Updated On Tue, Aug 6th, 2024 by Saurenergy Wind Energy company Inox Wind Limited (IWL) today announced bagging an order for 201 MW of wind turbines from Integrum Energy Infrastructure Ltd, a leading C&I player. The Uttar Pradesh-based wind company received an equipment supply order for IWL’s latest 3 MW Wind Turbine Generators (WTGs). Additionally, Inox Wind will provide post-commissioning multi-year operations & […] Read more
After RE-Rich States, UP Emerges As The New Solar Park Hub Updated On Tue, Aug 6th, 2024 by Saurenergy Union Minister of State (MoS) for New and Renewable Energy and Power Shripad Yesso Naik recently updated Parliament on the state-wise penetration of solar parks across the country. The data shared by the minister detailed solar park projects developed in 13 states. An analysis of the data revealed that after the high penetration of solar […] Read more
SECI Issued 8.4 GW Green Project Tenders In 2023-24: Data Updated On Tue, Aug 6th, 2024 by Saurenergy The Solar Energy Corporation of India Limited (SECI) in its recent statement said that it has been able to issue renewable energy tenders of upto 8440 MW in 2023-24. The central tendering authority recently talked about its annual performance in the last fiscal year. It also declared financial results of the company. “In FY24, SECI […] Read more
With A Focus On Gujarat, BHEL Executes 1155 MW Solar Projects Updated On Mon, Aug 5th, 2024 by Saurenergy Shripada Yesso Naik, Minister of State (MoS) for the Ministry of New and Renewable Energy (MNRE) said that BHEL (Bharat Heavy Electricals Limited) has executed solar energy projects of up to 1,155 MW. The minister shared the figures in his recent statements before the Lok Sabha. As per the information shared by the minister, the […] Read more
Manager-Engineering & Commissioning Renewable Projects Updated On Mon, Aug 5th, 2024 by Saurenergy Responsibilities:- Having Knowledge of PLC, SCADA Automation work, HMI Design, Factory Acceptance Test, etc. Knowledge of Design Engineering documents like RFQ, GAD, FDS, FAT, SAT, Signal List etc. as per project requirement. Have experience of managing the team. Responsible for the development & deployment of Solar Scada systems and the programming of PLC’s. Knowledge of […] Read more
BluPine Energy On Track To Achieve Its RE Targets: Rahul Mishra Updated On Mon, Aug 5th, 2024 by Saurenergy BluPine Energy started operations in India in 2021. Since then what were the major milestones for the firm? BluPine started its Commercial and Industrial (C&I) segment in 2022. Since then, we have secured around 400 MW of C&I projects in states like Karnataka, Maharashtra, and Chattisgarh. The company has planned to add a cumulative renewable […] Read more
Amara Raja Reports Solid Q1 Results, Commissions 90 MW Solar For NTPC Updated On Mon, Aug 5th, 2024 by Saurenergy Hyderabad based Amara Raja Energy & Mobility Limited (ARE&M), (formerly known as Amara Raja Batteries Limited), has reported profit before tax of ₹ 328.66 Cr for Q1 of FY25 registering a growth rate of 23% over Q1 of FY24. Standalone financial performance highlights: (₹ in crores) Particulars Quarter Ended Jun 30, 2024 Jun 30, 2023 Revenue […] Read more
Shakti Pumps Secures Order To Supply 12,537 Solar Pumps To UP Updated On Fri, Aug 2nd, 2024 by Saurenergy To boost the availability of solar water pumps throughout Uttar Pradesh (UP), the State Department of Agriculture has awarded a Letter of Intent (LoI) to Shakti Pumps. The Madhya Pradesh-based solar pump company received an order for 12,537 pumps to be supplied across the state under the Component B of the PM-KUSUM scheme (Phase-III). The […] Read more