Asset Management O&M (Solar) Updated On Wed, Nov 6th, 2024 by Saurenergy Responsibilities:- Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up,testing, […] Read more
Datta, Gentari, Juniper, EG Energy, Sunsure Secure SJVN’s 1.2 GW Hybrid Project Updated On Wed, Nov 6th, 2024 by Saurenergy SJVN has announced that Datta Infra, Gentari India, Juniper Green Energy, EG Energy, and Sunsure Energy are the winners of its 1200 MW ISTS-connected Wind Solar Hybrid Tender auction. These companies secured the project at a tariff of Rs 3.19/kWh. The tender for this project was released in June of this year, and the results […] Read more
KP Green Energy Secures 1.0037 GW Order From GUVNL Updated On Tue, Nov 5th, 2024 by Saurenergy KPI Green Energy Limited, the renewable EPC vertical of KP Group, recently secured 1.0037 GW renewable energy project from GUVNL. These projects are won by KPI Green Energy Limited under the various tenders of the Gujarat Urja Vikas Nigam Limited (GUVNL). The Gujarat-based company will be responsible for providing a range of services, including Engineering, […] Read more
Apollo Green Energy Plans To Go Public In 2025, Targets Rs 10,000cr Portfolio Updated On Tue, Nov 5th, 2024 by Saurenergy Apollo Green Energy Limited (AGEL), part of Apollo International Group, is set to build a ₹10,000 crore project portfolio by 2025. Currently, the company manages an order book of ₹3,500 crore, with ₹2,500 crore of ongoing solar projects across various states in India. As part of its growth plan, AGEL is also preparing for a […] Read more
India’s Solar Future Faces Climate Challenge, Says IIT-Delhi Study Updated On Tue, Nov 5th, 2024 by Saurenergy India’s rapid solar energy expansion aims to power its climate commitments, yet new research reveals that climate change could pose significant challenges to the nation’s solar potential. A study from IIT Delhi (Dr. Sushovan Ghosh, Prof. Dilip Ganguly, Prof.Sagnik Dey, Mr.Subhojit Ghoshal Chowdhury), published in Environmental Research Letters (https://doi.org/10.1088/1748-9326/ad8c68), examines India’s photovoltaic (PV) potential through […] Read more
Green Energy Developer Acme Solar’s IPO To Open On Wednesday, Nov 6 Updated On Mon, Nov 4th, 2024 by Saurenergy ACME Solar Holdings Limited’s Initial Public Offering will open on Wednesday, November 06. The company has set a price band at ₹275/- to ₹289/- per Equity Share, indicating final pricing in all probability at Rs 289 for each share with a face value of Rs 2 , considering the high demand for green developers. RHP […] Read more
Bridgeway Power Launches First Virtual Net Metering Solar Plant In Delhi Updated On Mon, Nov 4th, 2024 by Saurenergy Bridgeway Power, a residential and commercial solar installation company, recently installed the first Virtual Net Metering (VNM) solar plant under BRPL (BSES Rajdhani Power Limited) of 21.60kW capacity in Delhi. This project has opened new avenues for energy sharing and cost savings across multiple locations. The project uses a bi-facial panels and micro-inverter technology. VNM […] Read more
NTPC, ONGC Form JV For Renewable Energy Updated On Mon, Nov 4th, 2024 by Saurenergy Maharatna PSUs NTPC and ONGC have collaborated to form a Joint Venture Company (JVC) through their Green Energy Subsidiaries (NTPC Green Energy Ltd. and ONGC Green Energy Ltd.) to further promote their interest in renewable and new energy arena. Subsequent to the signing of the Joint Venture Agreement on 7th February 2024, during India Energy […] Read more
SECI Tenders For 1.2 GW RTC Renewable Energy Projects Across India Updated On Mon, Nov 4th, 2024 by Saurenergy SECI, has issued a tender to select renewable power developers to supply 1.2 GW of Round-the-Clock (RTC) power for renewable projects across India. The last date for bids submission is 16th December. With a commissioning time of 24 months, the 4 hour RTC supply will need to maintain a Demand Fulfillment Ratio (DFR) of 80% […] Read more