Water Agency In Pakistan Moves To Power Disposal Stations With Solar Energy Updated On Tue, Dec 14th, 2021 by Saurenergy Lahore-headquartered Water and Sanitation Agency (WASA) has planned to convert five of its major disposal stations to solar energy. This was revealed by Water and Sanitation Agency (WASA) Managing Director Syed Zahid Aziz during an online performance review meeting of all Wasas in Punjab, Pakistan. The meeting also discussed capacity building issues of all Wasas. […] Read more
Serbia to Develop 11.3 GW of Solar and Wind Power Projects Updated On Tue, Dec 14th, 2021 by Saurenergy Serbia has released its draft program of economic reforms for the period 2022-2024, which envisages the implementation of state projects for the construction of wind farms with a capacity of 3,000 megawatts (MW) and solar power plants with a capacity of 8,300 MW. Serbia drafts the economic reforms program every year as a candidate country […] Read more
California Might Cut Major Rooftop Solar Incentive After Years of Debate Updated On Tue, Dec 14th, 2021 by Saurenergy California on Monday proposed reducing the rate at which homeowners can sell excess electricity from their rooftop solar panels into the grid, weakening a policy that has underpinned dramatic growth in the renewable energy industry for years. The announcement by the California Public Utilities Commission triggered an outcry from the solar panel installation industry, whose […] Read more
AGEL Signs 4667 MW PPA, Manufacturing Linked Project Moves Into High Gear Updated On Tue, Dec 14th, 2021 by Saurenergy Adani Green Energy Ltd (AGEL), the renewable energy arm of the diversified Adani Group, has signed an agreement with the Solar Energy Corporation of India (SECI) to supply 4,667 MW of green power. The firm claims this is the world’s largest ever green power purchase agreement. It also marks decisive movement on the 8000 MW […] Read more
MERC approves MSEDCL To Procure At Rs 3.05 For 111 MW Solar projects under MSKVY Updated On Mon, Dec 13th, 2021 by Saurenergy In an order issued last week, the Maharashtra Electricity Regulatory Commission (MERC) gave its approval to Maharashtra State Electricity Distribution Company Limited for starting the procurement process of 111 MW of grid connected Solar power projects under the ‘Mukhyamantri Saur Krishi Vahini Yojana’ (MSKVY). The order covers a total of 33 respondent firms who had […] Read more
The US Doubles Down On Energy Storage Capacity Updated On Mon, Dec 13th, 2021 by Saurenergy The market for energy storage in US is making big strides, driven by the record growth in the past year even though Covid pandemic upset the momentum of various other industries across the world. Renewable storage market has rather been holding up the country’s economic prospects. Over the year 2020, 1,464 MW/3,487 MWh of new […] Read more
Energy Dome Offers a Step Forward For CCS Updated On Mon, Dec 13th, 2021 by Saurenergy Energy Dome, an Italian energy storage technology company founded in 2019, claims to use CO2 against climate change to develop long duration storage systems, based on Carbon Capture and Storage (CCS) Energy-related carbon dioxide emissions form the biggest share of emission worldwide and necessitating a decarbonization of the energy industry to solve the climate change […] Read more
Curbs On China Imports Fail To Slow Down Solar Imports For US In 2021 Updated On Mon, Dec 13th, 2021 by Saurenergy A research report from Rystad Energy lays bare the failure of US efforts to reduce dependence on Solar Imports, especially by curbing imports from China. According to the report, the US is on track to import a record 27.8 gigawatts (GW) of solar PV panels in 2021 from a range of countries, up from 26.7 […] Read more
MoP Approves 23 New ISTS Projects Worth ₹15,893 cr Updated On Fri, Dec 10th, 2021 by Saurenergy The Ministry of Power (MoP) and the Ministry of New and Renewable Energy (MNRE) has approved 23 new Inter State Transmission System (ISTS) projects with an estimated cost of Rs 15,893 crore. The new ISTS projects comprise 13 projects with an estimated cost of Rs 14,766 to be developed under Tariff Based Competitive Bidding (TBCB) […] Read more