60 GW Of PSP Projects Under Survey, Minister Tells Parliament Updated On Tue, Dec 3rd, 2024 by Saurenergy The latest update from the Ministry of New and Renewable Energy (MNRE) indicates that major pumped storage projects (PSPs) spread across nine states have a combined installed pumped storage potential of approximately 181.4 GW in the country. Parliamentary data shared by the Minister of State for New and Renewable Energy and Power, Shripad Yesso Naik, […] Read more
GUEST COLUMN: Understanding Ground-Mount Solar Systems Updated On Tue, Dec 3rd, 2024 by Saurenergy By-Shreyas Gowda A ground-mount project is a solar system installed on land rather than a rooftop, such as a concrete floor or a metal sheet. It comprises an array of photovoltaic modules supported by a module mounting structure (MMS). The panels convert sunlight into direct current (DC), the current is transferred to the inverter through […] Read more
GAIL Issues Tender To Build Rooftop Solar Project In Bangalore Updated On Tue, Dec 3rd, 2024 by Saurenergy GAIL, a natural gas company, recently released a tender to design a solar-integrated rooftop system (SITC) and an on-grid rooftop solar project with a net-metering system in Bangalore. The bidder would undertake net metering for the project in the preceding seven years from the bid due date. The last date for bid submission is 16th […] Read more
Jharkhand: DVC Opens Bid To Build 234 MW Floating Solar Project Updated On Tue, Dec 3rd, 2024 by Saurenergy Damodar Valley Corporation (DVC) recently released a tender to build a 234 MW grid-tied floating solar PV (FSPV) plant. This project is located on DVC’s Maithon Dam Reservoir at Maithon Jharkhand. The project included a 10-year comprehensive Operations and Maintenance (O&M). The last date for bid submission is 7th January 2025. The DVC tender said […] Read more
Equinix, Sembcorp Sign PPA To Develop 58.5 MWp Solar Project Updated On Tue, Dec 3rd, 2024 by Saurenergy Equinix, Inc., a digital infrastructure company, today signed its second renewable energy Power Purchase Agreement (PPA) with Sembcorp Power Pte. This project in Singapore with Sembcorp’s subsidiary is the second PPA. This collaboration provides Equinix solar project 58.5 MWp maximum capacity from JTC’s properties on Jurong Island. The project will start in 2029. This accounts […] Read more
SECI’s 9.29 GW Of Renewable Projects Still Await Buyers Updated On Tue, Dec 3rd, 2024 by Saurenergy The growth in tendering for utility-scale projects marks the progress within the renewable energy sector. Recent data shared by the Solar Energy Corporation of India (SECI) indicated a list of renewable projects that are yet to see buyers. As per the prescribed practice, the renewable project developers who win tenders through SECI tie up with […] Read more
TPREL Commissions 431 MW Solar Project At Neemuch In MP Updated On Tue, Dec 3rd, 2024 by Saurenergy Indian renewable energy company Tata Power Renewable Energy Limited (TPREL) today announced the commissioning of a 431 MW DC solar project at Neemuch in Madhya Pradesh. The solar project is spread across 1,635.63 acres of land. TPREL said this is India’s first solar project site to incorporate a combination of single-axis trackers and bi-facial modules. […] Read more
JinkoSolar Is Shipping 1GW Of Solar Modules In 4 Days: Data Updated On Mon, Dec 2nd, 2024 by Saurenergy Global solar module manufacturer JinkoSolar has announced a remarkable milestone, shipping 1 GW of solar modules every four days while surpassing a cumulative 300 GW in shipments worldwide. These achievements underscore JinkoSolar’s dominance and consistent growth in the renewable energy sector globally. Dominance of N-Type Tiger Neo Modules The company highlighted the success of its […] Read more
Khavda: CIL Awards KPI Green Contract For 300 MW Solar Project Updated On Mon, Dec 2nd, 2024 by Saurenergy Coal India Limited (CIL) has now awarded KPI Green a contract to set up 300 MW of its solar project at Khavda. CIL had earlier bagged this project from Gujarat Urja Vikash Nigam’s (GUVNL). The tender for this project was released in October this year. The tender result was released within a month. Coal India, […] Read more