Electrical Engineer – Renewables Updated On Fri, Oct 27th, 2023 by Saurenergy Renewables:- Experienced in overseeing and contributing to the success of large scale solar, wind and battery storage projects as electrical engineer. Guides clients on optimal electrical systems and requirements tailored to meet their needs, ensuring full compliance with relevant codes and standards. Experienced in design and review of detailed single-line diagrams (SLD) for high/medium/low voltage […] Read more
Suzlon Wins Repeat Order from Juniper for 50.4 MW Capacity Updated On Fri, Oct 27th, 2023 by Saurenergy Renewable energy solutions provider Suzlon has secured a new order for 50.4 MW for their 3 MW series turbines. The order has come from Juniper Green Energy Private Limited. Suzlon will install 16 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower of their new product with a rated capacity of 3.15 MW […] Read more
Battery Waste Management Rules 2023 Laid Down Updated On Fri, Oct 27th, 2023 by Saurenergy The Ministry of Environment, Forest & Climate Change has issued Battery Waste Management (Amendment) Rules, 2023 (BWMR 2023). The BWMR 2023 lays down the mandatory waste battery collection, recycling or refurbishment targets for electric vehicles battery of three wheelers, including E-rickshaw, categories L5, L5-M, L5-N, E-cart. Compliance Cycle: 2026-27, 2032-33 For the year 2026-2027, the […] Read more
EV Maker Ola Takes Home INR 3,200 in Fundraising Round Updated On Fri, Oct 27th, 2023 by Saurenergy Bengaluru’s electric vehicle firm Ola Electric has closed INR 3,200 crore in its fundraising round. The funds were raised from from marquee investors led by Singapore-based Temasek and project debt from State Bank of India respectively. The funds would be used be employed towards the expansion of Ola’s EV business and the establishment of a […] Read more
Waaree Renewable Q2 Results Stay Strong With 24% Growth YoY Updated On Thu, Oct 26th, 2023 by Saurenergy Waaree Renewable Technologies Limited, the Solar EPC /IPP subsidiary of Waaree Group, a solar developer that finances, constructs, owns and operates solar projects, has reported its unaudited financial results for the quarter ended September 30, 2023. The firm which has moved to a much faster growth path since 2021-22, has delivered a strong set of […] Read more
Bids For Standalone Wind In Tranche XIV In June 2023 Awarded Between INR 3.18-3.24 Per kWh: GWEC Updated On Thu, Oct 26th, 2023 by Saurenergy The India’s Wind Energy Market Outlook 2023-2027 released by the Global Wind Energy Council, says that by the end of 2022, total renewable energy installed in India stood at 121 GW of total installations with wind contributing 35% of this, making India the fourth-largest wind market in the world, in terms of cumulative installed capacity. […] Read more
NYSERDA Awards 1.3 GW Wind Capacity Under Community Offshore Initiative Updated On Thu, Oct 26th, 2023 by Saurenergy New York has provisionally awarded a Community Offshore Wind contract worth 1.3 GW. A joint venture between RWE and National Grid Ventures, Community Offshore Wind will be developed under a phase-wise approach within Community Offshore Wind’s 3.2 GW seabed lease in the New York Bight. The seabed lease was acquired during federal bidding by the […] Read more
Ministry of Power Releases Guidelines For Uniform Renewable Tariff Updated On Thu, Oct 26th, 2023 by Saurenergy The Ministry of Power has now approved the procedure for implementing a Uniform Renewable Energy Tariff for the end power procurers, including discoms and open-access consumers. It will be applicable to renewable energy projects connected with the Inter-State Transmission Systems (ISTS). It comes after the Electricity (Amendment) Rules 2022 discussed the uniform renewable tariff (URET). […] Read more
Enfinity Continues Italian Conquest with 97 MW Agreement Updated On Wed, Oct 25th, 2023 by Saurenergy Italy based firm A2A Group, which supplies energy solutions, has joined hands with Enfinity Global by way of a power purchase agreement (PPA) for three of Enfinity’s solar projects in Lazio, Italy. The three projects account for a cumulative capacity of 97 MW. The agreement begins to take shape in July 2025. A2A Group is […] Read more