Torrent Power Secures 450 MW Wind-Solar Hybrid Project Updated On Mon, Apr 1st, 2024 by Saurenergy Torrent Power, a Gujarat power company has announced it has secured 300 MW power from wind-solar hybrid energy projects, with a greenshoe option of up to 150 MW through an auction. Further, the company also stated that it won the auction after quoting Rs 3.65/kWh The tender for 300 MW of power supply, with a […] Read more
IOCL, Panasonic Energy Form JV For EV Batteries Updated On Mon, Apr 1st, 2024 by Saurenergy Indian Oil Corporation Limited and Panasonic Energy, a Panasonic Group Company, have signed a binding term sheet to draw a framework for the formation of a JV for manufacturing cylindrical lithium-ion cells in India in anticipation of expanding demand for batteries for two and three-wheel vehicles and energy storage systems in the Indian market, the […] Read more
Austria Development Bank Invests In RE Firm AMPIN Energy Updated On Sat, Mar 30th, 2024 by Saurenergy Renewable energy transition company AMPIN Energy Transition has announced an investment from OeEB, the Development Bank of Austria. OeEB will be investing EUR 25 million in long-term financing to support AMPIN Energy Transition in further expanding its renewable energy portfolio and establishing a local 1GW solar cell and module production facility in the state of […] Read more
Adani Green Operationalises 1 GW Of Solar Projects At Khavda Within 24 Hours Updated On Fri, Mar 29th, 2024 by Saurenergy In two back to back filings at the Bombay Stock Exchange (BSE), Adani Green Energy Limited has announced the operationalisation of two traches of solar projects at Khavda Gujarat. While one involved a group of projects adding upto 775 MW, the other filing pertained to a further 212 MW of projects operationalised. The announcements follow […] Read more
ALMM To Rule Solar From April 1, 2024 in India Updated On Fri, Mar 29th, 2024 by Saurenergy Putting to rest any doubts over the future of sourcing for key solar projects, the Ministry of New and Renewable Energy (MNRE) has confirmed the deadline of March 31 for ending all ALMM related exemptions for developers in a terse, one page office memorandum. At SaurEnergy, we had predicted this outcome early this week. That […] Read more
Luminous Moves Forward On Solar Panel Mfg. With 250 MW Panel Plant Updated On Thu, Mar 28th, 2024 by Saurenergy Leading energy solutions firm Luminous Power Technologies inaugurated its Solar Panel Factory in Rudrapur, Uttarakhand. The company claims the facility has cutting-edge technology and infrastructure designed to ensure maximum efficiency and minimal environmental impact. The launch was graced by legendary cricketer and Luminous Brand Ambassador Sachin Tendulkar, accompanied by Preeti Bajaj, CEO & MD, Luminous Power Technologies, and Manish […] Read more
GUVNL Invokes Greenshoe Option For 880 MW Grid-Connected Solar Projects Updated On Thu, Mar 28th, 2024 by Saurenergy Gujarat Urja Vikas Nigam Limited (GUVNL) has announced its plans to secure 500 MW of power from grid-connected solar photovoltaic (PV) projects. GUVNL has floated the tender for the purchase of power from 500 MW Grid Connected Solar Photovoltaic Power Projects to be set up/under construction/already commissioned projects anywhere in India with Greenshoe Option of […] Read more
Ramboll To Work On Foundations For 1.4 GW Polish Offshore Wind Projects Updated On Thu, Mar 28th, 2024 by Saurenergy Equinor and Polenergia have signed contracts with Denmark-headquartered Ramboll for the Bałtyk II and offshore wind projects in the Polish Baltic Sea, said the company in its media statement. Under the contracts, Ramboll will provide engineering services for 100 monopiles for the Bałtyk II and Bałtyk III projects. Equinor and Polenergia also finalised contracts for […] Read more
Sungrow Moves Ahead On 291MWh BESS Project In South Australia Updated On Thu, Mar 28th, 2024 by Saurenergy Sungrow, the leading PV inverter and energy storage system supplier, was awarded notice to proceed (NTP) from ZEN Energy for the commencement of the 111MW/291MWh Templer’s Battery Energy Storage System (BESS) project in South Australia. The project was planned in partnership with ZEN Energy as the client and Shanxi Electric Power Construction (SEPC) as the […] Read more