Solar Power to Supply Water in Hyderabad Updated On Mon, Jan 21st, 2019 by Saurenergy The board plans to set up solar power plants on the surface of reservoirs, save electricity bills that run into anything between Rs 80 crore to Rs 90 crore a month. The Hyderabad Metropolitan Water Supply and Sewage Board (HMWS&SB) is planning to supply water to its consumers using solar power. As the board looks […] Read more
Vikram Solar Commissions 20 MW Solar Project for WBSEDCL Updated On Mon, Jan 21st, 2019 by Saurenergy The plants are located at Patni, near Kharagpur and at Lalgarh, near Midnapore, West Bengal. Vikram Solar, one of India’s leading module manufacturer and prominent EPC solutions and rooftop solar provider, has commissioned two 10 MW solar projects for the West Bengal State Electricity Distribution Company (WBSEDCL). The plants are located at Patni, near Kharagpur […] Read more
SWTD Bets on the Success of Solar Boats Updated On Mon, Jan 21st, 2019 by Saurenergy Starting in April 2019, the department will launch three solar boats into its service across the backwaters of Kottayam and Alappuzha districts. The State Water Transport Department (SWTD) of Kerala is out to take maximum advantage of the sun, as it plans to introduce three solar-powered boats into its service after the success of its […] Read more
DERC Approves 100 MW Wind Power Agreements Updated On Mon, Jan 21st, 2019 by Saurenergy The tariff of the PSA will be Rs 3.53/kWh, which will comprise of the Rs 3.46/kWh tariff quoted by developer and PTC’s trading margin of Rs 0.07/kWh. The Delhi Electricity Regulatory Commission (DERC) has issued a notification with the approval of two power sale agreements between BSES Rajdhani Power Ltd (BRPL) and PTC India Ltd […] Read more
SolarReserve Names Tom Georgis as CEO Updated On Sat, Jan 19th, 2019 by Saurenergy For the past 10 years, Georgis has been an integral part of SolarReserve’s leadership team, serving as it’s Senior Vice President. Solar power projects developer SolarReserve has appointed Tom Georgis as it’s Chief Executive Officer (CEO). For the past 10 years, Georgis has been an integral part of SolarReserve’s leadership team, serving as it’s Senior Vice […] Read more
AAI Seeks Contractors for 4 MW Solar Plant at Bhubaneswar Airport Updated On Fri, Jan 18th, 2019 by Saurenergy The estimated project cost is Rs 258,781,444 and the project completion timeframe is four months from the time the contract is awarded. The Airports Authority of India (AAI) is looking for an engineering, procurement, and construction (EPC) contractor to develop a 4 MW ground-mounted solar photovoltaic (PV) project at the Biju Patnaik International (BPI) Airport in Bhubaneswar. The […] Read more
Waaree Installs Solar Plant at HIAL University in Leh Updated On Fri, Jan 18th, 2019 by Saurenergy HIAL is expected to save close to Rs 2 lakh per year. Waaree Energies, one of India’s leading solar PV manufacturer has unveiled its 25 kW rooftop solar project at Himalayan Institute of Alternatives (HIAL) in Leh, Ladakh. The project was completed under the company’s CSR programme and is part of its ongoing efforts to […] Read more
HyET Solar Seeks to Make In India 300 MW Solar Panels Updated On Fri, Jan 18th, 2019 by Saurenergy At the Vibrant Gujarat Global Summit, HyET Solar will sign a memorandum of understanding with the state to set up a solar module manufacturing facility. Dutch foldable solar panel-maker HyET Solar BV seeks to “Make In India” and is eyeing partnerships with existing solar panel makers and a polymer-maker, commercial director of the company Pieter […] Read more
MMRDA Issues Tender for 7.63 MW of Rooftop Solar Projects for Mumbai Metro Updated On Fri, Jan 18th, 2019 by Saurenergy The last date of bid submission is March 15, 2019, and the tender will open on March 18, 2019 The Mumbai Metropolitan Region Development Authority (MMRDA) is inviting bids for setting up of 7.63 MW of rooftop solar PV projects at the site of Mumbai Metro Rail project line 7 and 2A. The brief scope […] Read more