SECI Confirms Annulment of 3 GW Manufacturing Linked Solar Tender Updated On Fri, Jun 28th, 2019 by Saurenergy SECI has announced the annulment of its tender for the selection of solar power developers for setting up of 3 GW manufacturing linked solar tender The Solar Energy Corporation of India (SECI) has announced the annulment of its tender for the selection of solar power developers for setting up of 3 GW ISTS-connected solar PV […] Read more
A 100% Renewable US Power Grid Could Cost $4.5 Trillion Updated On Fri, Jun 28th, 2019 by Saurenergy According to a new analysis, the transition to a 100% renewable US power grid will need an investment of up to US$4.5 trillion over the next 10 to 20 years. A new analysis has revealed that the transition to a 100 percent renewable US power grid will need an investment of up to US$ 4.5 […] Read more
Engie’s Renewable Energy Capacity in India Exceeds 1500 MW Updated On Fri, Jun 28th, 2019 by Saurenergy Engie has announced that following a series of successes in auctions, its total renewable capacity in India now exceeds 1500 MW. French multinational electric utility, Engie has announced that following a series of successes, its total renewable capacity in India now exceeds 1500 MW. The company has revealed in a statement that it was was […] Read more
Chandigarh Extends Deadline for Installation of Solar Plants by 3 Months Updated On Fri, Jun 28th, 2019 by Saurenergy The Chandigarh administration has extended the deadline for installation of solar rooftop plants on residential homes in the Union Territory by three months The Chandigarh administration has extended the deadline for installation of solar rooftop plants on residential homes in the Union Territory by three months. This is now the third time that the UT […] Read more
Dispute Resolution Committee Takes Shape as Power Minister Selects Members Updated On Thu, Jun 27th, 2019 by Saurenergy In a major decision to facilitate the solar and wind energy projects R K Singh, Power Minister has selected the members of the Dispute Resolution Committee In a major decision to facilitate the solar and wind energy projects, R K Singh, Union Minister of State for Power and New & Renewable Energy (IC) has approved […] Read more
Renewables to Provide 21% Electricity for Energy Hungry Data Centres: Survey Updated On Thu, Jun 27th, 2019 by Saurenergy A new survey has projected then that around 21% of the power required to run data centres would come from renewables by 2025. A new survey has revealed that corporates aren’t as bullish on the prospects for renewables like solar and wind power in powering data centres as they were in 2014. They had projected […] Read more
GE Renewable Energy & Enerfín to Construct 50 MW Wind Farm in Valencia Updated On Thu, Jun 27th, 2019 by Saurenergy Enerfín has announced the start of construction on the 50 MW Cofrentes wind farm, which will be powered by 13 GE Renewable Energy onshore wind turbines. Enerfín, the wind energy focussed arm of Spain’s leading infrastructure and renewable energy group Elecnor has announced the start of the construction on the 50 MW Cofrentes wind farm […] Read more
Europe to Surpass 250 GW Installed Solar Capacity by 2024: Report Updated On Thu, Jun 27th, 2019 by Saurenergy According to a new report, the total installed solar capacity in Europe will surpass 250 GW by 2024, with new solar installations doubling in the next 3 years According to a new report, new solar installations in Europe will double in the next 3 years to reach a level of approximately 20 GW/year, and the […] Read more
SECI Floats Tender For 1800 MW of Wind Power Projects (Tranche-VIII) Updated On Thu, Jun 27th, 2019 by Saurenergy SECI has issued a tender for setting up of 1800 MW ISTS-Connected wind power projects under Tranche-VIII. The Solar Energy Corporation of India (SECI) has issued a tender for selection of wind power developers for setting up of 1800 MW ISTS-Connected wind power projects under Tranche-VIII. Wind Power Developers (WPD) selected by SECI based on […] Read more