AMPIN Signs Pact With Poly Medicure To Boost Solarisation Updated On Tue, Apr 1st, 2025 by Saurenergy AMPIN Energy Transition has signed a power purchase agreement (PPA) with medical device manufacturer Poly Medicure to supply 9.9 MWp of solar power to its five plants from AMPIN’s 75 MWp solar park in Kurungawali Sirsa, Haryana. Under the deal, about 35% of Poly Medicure’s power consumption at its five Faridabad plants will be replaced […] Read more
Coffee Farmers In Ethiopia Now Use Solar Dryers To Boost Output Updated On Tue, Apr 1st, 2025 by Saurenergy Covestro has developed specialized solar dryers made of polycarbonate to assist coffee farmers in Ethiopia during the harvest season. The initiative, launched in collaboration with the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, aims to support disadvantaged regions globally with simple, effective technologies. Six solar dryers have been installed in Ethiopia, with the project gaining […] Read more
ALMM: Waaree Remains At Top, Goldi Solar Picks Pace Updated On Tue, Apr 1st, 2025 by Saurenergy The latest Approved List of Models and Manufacturers (ALMM), issued by the Ministry of New and Renewable Energy (MNRE), has reported significant changes in various solar companies’ cumulative solar module manufacturing capacities. A comparison of the total capacities of 95 solar module manufacturing units listed under the ALMM revealed that Waaree Energies remained at the top […] Read more
NHPC Connects 300 MW Rajasthan Solar Project Updated On Tue, Apr 1st, 2025 by Saurenergy NHPC has connected the 300 MW Bikaner Solar Power Project, in Rajasthan with ISTS and started injecting 31 MW of power into the grid on March 31, 2025, said the company. NHPC said in a regulatory filing, “The commercial declaration of the part capacity of 100 MW in phases shall be intimated in due course. […] Read more
5 Ways Battery Storage Is Transforming Solar Energy Deployments Updated On Tue, Apr 1st, 2025 by Saurenergy Solar power’s biggest ally, the battery energy storage systems (BESS), has arrived in force in 2024. The pairing of batteries with solar photovoltaic (PV) farms is rapidly reshaping how and when solar energy is used, turning daylight-only generation into flexible, round-the-clock power. BESS has meant the momentum does not flag for solar deployments, even in […] Read more
Kosol Energie Installs Solar System At Sarangpur Dham Updated On Mon, Mar 31st, 2025 by Saurenergy Kosol Energie has successfully installed a 250 KW solar power system at Shree Gopalanand Swami Yatrik Bhavan in Sarangpur Dham, significantly enhancing energy efficiency while reducing carbon emissions. This initiative ensures a sustainable and uninterrupted power supply for the Yatrik Bhavan (Stay Facility), setting a benchmark for renewable energy adoption in spiritual spaces. The Grand […] Read more
UPPCL Discovers A Tariff Of Rs 2.56/kwh For 2 GW Solar Project Updated On Fri, Mar 28th, 2025 by Saurenergy Uttar Pradesh Power Corporation Limited (UPPCL) has concluded its 2 GW solar auction, awarding projects to four bidders: ReNew Solar Power, Fastnote Biofuels (Hindustan Power), and Adani Renewable Energy Holding Twelve. UPPCL released the tender for this project in February 2024 and declared the results after a year. According to the tender results, the lowest […] Read more
Adani Green Secures 400 MW UPPCL Solar Project At ₹2.57/kWh Updated On Fri, Mar 28th, 2025 by Saurenergy Adani Green’s subsidiary–Adani Renewable Energy Holding Twelve Limited (AREH12L), recently secured a 400 MW solar project from Uttar Pradesh Power Corporation Limited (UPPCL) at a tariff of ₹2.57/kWh. The company informed its investors in its regulatory filing before the exchanges. It said, “Adani Renewable Energy Holding Twelve Limited (AREH12L), a subsidiary of Adani Green, received […] Read more
Manager- Solar Site Quality_Electrical Updated On Thu, Mar 27th, 2025 by Saurenergy Ensuring installations are carried out as per approved FQP’s. Supervise & Monitor quality work at project site. Prepare and revise FQAP and checklists. Ensure Quality work through our own Engineers and TPAs. Ensure that NCs are minimised and are closed quickly, and verification of RCA and Corrective actions. Imparting Job specific trainings at site. Auditing […] Read more