NTPC Issues Tender To Build Pilot BESS At Dadri Thermal Plant Updated On Thu, Jan 16th, 2025 by Saurenergy NTPC recently issued a tender to build and test a pilot project for proof of concept to replace diesel generators (DGs) with battery energy storage systems (BESS) at the Dadri Thermal Plant. The plant will be located at NTPC Dadri Stage-I. NTPC sought bids from interested parties until February 10, 2025. Prior Experience The bidder […] Read more
TREDA Issues Pre-Feasibility Tender for PSP In Tripura Updated On Thu, Jan 16th, 2025 by Saurenergy The Joint Director of the Tripura Renewable Energy Development Agency (TREDA) issued an e-tender, soliciting bids to set up a Pumped Storage Project in Tripura from prospective bidders. The agency, on behalf of the organization, invited tenders to establish consultancy services for the preparation of a Pre-Feasibility Report (PFR). TREDA has sought bids from interested […] Read more
Non-Utility Share Of Over 25% Stood Out In 2024 In India: SBI Caps Updated On Thu, Jan 16th, 2025 by Saurenergy Investment bank SBI Capital Markets (SBI CAPS), in a report on non-utility solar in India, has hailed 2024 as the year when non-utility solar finally crossed the 25% threshold in India. Declining module and EPC costs, coupled with cheaper cells expanding off-grid potential, facilitate solar adoption. Non-utility solar is poised for significant growth, with annual […] Read more
Adani Subsidiary Commissions 57.2 MW Hybrid Project At Khavda Updated On Tue, Jan 14th, 2025 by Saurenergy Adani Renewable Energy Forty Eight Limited, a step-down subsidiary of Adani Green Energy Limited (AGEL) has commissioned a 57.2 MW wind power component. This component is part of its wind-solar hybrid project at Khavda, Gujarat. The company informed its investors about its latest development today. In its regulatory filing before the exchanges, it said, “With […] Read more
Maharashtra: BrightNight Commissions First Phase Of 115MW Hybrid RE Project Updated On Tue, Jan 14th, 2025 by Saurenergy US-based BrightNight, a global renewable power producer, recently commissioned the first phase of Optima Maharashtra, a 115 MW hybrid renewable power project in India. It’s also one of the first co-located wind-solar projects in Maharashtra. The project is located in Dharashiv, Southern Maharashtra, and spanning about 1400 acres, Optima Maharashtra integrates advanced wind and solar […] Read more
Chief Manager- Assurance Services Updated On Tue, Jan 14th, 2025 by Saurenergy Key responsibility is to lead, direct, monitor and control Solar Module On-site testing for EL, IV and Flesh Test within Asset management activities for Wind Hybrid Projects to deliver robust, reliable, and sustainable operational performance through best-in-class operational excellence for Hybrid Renewable Projects Responsibilities:- Creating and advocating a consistent and high level of compliance with […] Read more
NTPC REL Issues 2.5 GW BESS Tender For Its Thermal Plants Updated On Tue, Jan 14th, 2025 by Saurenergy NTPC REL recently released a tender to develop a 2500 MW/10,000 MWH Battery Energy Storage System (BESS) project. The NTPC subsidiary has planned the project as spread across NTPC thermal power stations. The last date to submit the bids is February 17, 2025. The tender document elaborated on the project’s capacity. It mentioned, “The battery […] Read more
Senior Engineer – Module Production Updated On Mon, Jan 13th, 2025 by Saurenergy Responsibilities:- Manpower allocation/ Ensure cleaning activity of critical machines/ 100% production adherence as per plan for respective shift 5S Activity / identify safety hazard and timely closure of Near miss/incident investigation if any. Communication with PPC team with respect to production order and RM Line in charge meeting with operator Defect discussion/production output Verification of […] Read more
Site Engineer Updated On Sun, Jan 12th, 2025 by Saurenergy SafEarth is looking for experienced site engineers to lead deployment of quality solar plants on various sites across the country. The selected candidates will be responsible for leading the on site construction team and monitoring the quality and safety of the work being conducted by them Job Responsibilities:- Leading the site team to ensure that construction […] Read more