Panchayats asked to setup solar pump sets and divert money saved for other developmental activities Updated On Tue, Mar 22nd, 2016 by Saurenergy P. Ashok Gajapathi Raju, Union Civil Aviation Minister at the inauguration of solar pump sets asked panchayats to setup solar pump and use money saved on power consumption for other developmental activities. Gajapathi Raju on Sunday inaugurated solar pump sets that were established under Members of Parliament Local Area Development Scheme (MPLADS) at Duppada village […] Read more
Europe’s largest floating power station set to power up Updated On Tue, Mar 22nd, 2016 by Saurenergy Europe’s largest floating power farm is close to completion and is all set to power up, in spite of a cut in solar subsides which left its fate at risk. The £6 million (about $8 million) project will help power local water treatment plants that provide clean drinking water to London and south-east England’s 10 […] Read more
Need to find ways for solar energy to become norm rather than exception: Piyush Goyal Updated On Mon, Mar 21st, 2016 by Saurenergy Union Minister of State (IC) for Power, Coal New and Renewable Energy Piyush Goyal at the launch of a report titled, “Scaling up Private Investment in Rooftop Solar” said that there is a need to find ways for solar energy to become norm rather than exception. Goyal said that people can benefit from generating rooftop […] Read more
Mahagenco to step up solar power generation on top of water bodies Updated On Mon, Mar 21st, 2016 by Saurenergy Maharashtra State Power Generation Company Limited (Mahagenco) has revealed plans to step up solar power generation atop water bodies with water resources department and local self-governing bodies reports TOI. The company officials are working closely with government agencies owning the water bodies on revenue-sharing model. Mahagenco replicating the Gujarat model will cover canals and water […] Read more
Tata Power Solar commissions a 4.8 MW solar power plant for Rajaram Maize Products Updated On Mon, Mar 21st, 2016 by Saurenergy Tata Power Solar, an integrated solar company has commissioned a 4.8 MW solar power plant for Rajaram Maize Products (a leading player in the starch and glucose manufacturing segment in India) to meets its entire power requirement through renewable energy. The solar power plant spread across 22 acres at Rajnandgaon district in Chhattisgarh was set […] Read more
SolaireDirect bags 75MW solar power project in Uttar Pradesh Updated On Mon, Mar 21st, 2016 by Saurenergy French multinational electric utility company ENGIE through its subsidiary Solairedirect has won a 75 MW solar power project in Uttar Pradesh. The firm has quoted viability gap funding (VGF) of Rs.7.435 million/MW. Last week Solar Energy Corporation of India (SECI) awarded a 50MW project to Indian conglomerate RattanIndia Power in Allahabad, Uttar Pradesh with VGF […] Read more
Whitbread completes installation of 88 solar arrays at Premier Inn sites across UK Updated On Mon, Mar 21st, 2016 by Saurenergy Whitbread has completed installation of 88 solar arrays at Premier Inn sites across the UK, it is expected to deliver £280,000 in energy cost savings a year. The company in a statement said that solar arrays are now installed at 12% of Premier Inn sites and each array can deliver around 10% of the hotel’s […] Read more
Rooftop Solar Coaches to soon run in Jodhpur Updated On Fri, Mar 18th, 2016 by Saurenergy From this fiscal year around 50 rail coaches integrated with solar panels will be introduced from the North Western Railway (NWR) workshop in Jodhpur. After a successful pilot project, the railway authorities have intended to lay rooftop solar in a special operational non-ac coaches that will be capable enough to run tube lights and fans. […] Read more
GCDA fumbles on Marine Drive solar power project changes site to Ambedkar Stadium Updated On Fri, Mar 18th, 2016 by Saurenergy Greater Cochin Development Authority (GCDA) decides shifting of its solar energy project from Marine Drive to Ambedkar Stadium. With skeptics on the resistance of a 30 year old building the tentative modification were alerted by the officals. A GCDA official said that the building was constructed in 1987 by reclaiming the waterbody. “The building is […] Read more