Jolywood was Invited to Participate in the First Belt and Road Energy Ministerial Conference Updated On Mon, Oct 29th, 2018 by Saurenergy Jolywood (Suzhou) Sunwatt Co. Ltd. (SZ: 300393) (Jolywood), the world’s leading supplier of N-type high efficiency bifacial solar cells and modules, was a key participant in the 2018 Belt and Road Energy Ministerial Conference and International Forum on Energy Transition (“the Conference”) to discuss energy cooperation and the future of new energy. Mr. Lin Jianwei, […] Read more
Piyush Goyal Gets Top Prize in Energy Policy Updated On Sat, Oct 27th, 2018 by Saurenergy As former Minister of Power and Renewables, Goyal fast-tracked the electrification of 18,000 remote villages in India—bridging the country’s vast energy divide. The Kleinman Center for Energy Policy bestowed its highest award ‘Carnot Prize’ to Piyush Goyal, India’s former Minister of Power and Renewables and current Minister of Railways and Coal. As former Minister of […] Read more
Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v) Updated On Sat, Oct 27th, 2018 by Saurenergy SOLAR ENERGY CORPORATION OF INDIA LIMITED Selection of 1200 MW ISTS-connected Wind Power Projects (Tranche-V) (RfS No: SECI/C&P/WPD/1200MW/T5/RfS/022018 dated 30.06.2018) After Technical Bid Opening After e-Reverse Auction (held on 25.09.2018) Sl. No. Bidder’s Name Capacity (MW) Bidder’s Name Bidder’s Quantity (MW) Tariff (INR/kWh) Awarded capacity (MW) 1 Alfanar Company 300 Torrent Power Limited 115 2.76 […] Read more
Amendment – 4 : RFB for 160 mw Solar-Wind Hybrid Power Plant with Bess at Ramagiri, AP, India Updated On Sat, Oct 27th, 2018 by Saurenergy Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Project: Innovation in Solar Power and Hybrid Technologies Project Contract title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 160 MW Solar-Wind Hybrid Power Plant with BESS including 10 Years Plant O&M under International competitive bidding at Ramagiri, Anantapur district, Andhra Pradesh, India RFB […] Read more
Waaree Energies Expands Footprint to SE Asia; Bags 60 MW Solar Project in Vietnam Updated On Fri, Oct 26th, 2018 by Saurenergy The company will be using its high efficiency mono-crystalline panels for this project. One of the leading solar PV manufacturer Waaree Energies has secured a 60 MW ground mounted on-site solar project in Vietnam. With the Turnkey Engineering, Procurement and Construction (EPC) contract, along with Operations and Maintenance (O&M), the project also marks the company’s […] Read more
Risen Energy Wins 50MW PV Contract from Bitexco Group’s Arm Updated On Fri, Oct 26th, 2018 by Saurenergy The electricity generated by the project will be provided to EVN, the Vietnamese state grid. Australia-based solar PV panels maker Risen Energy has won the bid for the NHI HA 50MW solar power station project owned by Vietnam-based Bitexco Group’s subsidiary Thap Cham Solar. The company said in a statement that, combined with the contracts won by […] Read more
Renew Power Partners with CII in its ‘Clean Air Better Life’ Initiative for Punjab Updated On Fri, Oct 26th, 2018 by Saurenergy Under this program, the company has committed to support 500 farmers from Ludhiana district and provide them access to climate smart technological solutions for farm residue management. India’s one of the leading renewable energy IPP, ReNew Power has collaborated with Confederation of Indian Industries (CII) in its ‘Clean Air Better Life’ initiative to help Punjab farmers; with alternative stubble […] Read more
JinkoSolar Ranked as Top Performer for 4th Consecutive Yr by DNV GL Updated On Fri, Oct 26th, 2018 by Saurenergy The global quality assurance and risk management company, DNV GL, tested over 300 bills of material (BOM) for more than 50 module manufacturers. One of the leading solar module manufacturers JinkoSolar Holding (JinkoSolar) has been recognized as a Top Performer on DNV GL’s 2018 PV Module Reliability Scorecard for the fourth consecutive year. Commenting on […] Read more
Karnataka CM Instructed Officials to Ensure No Interruption in Power Supply Updated On Fri, Oct 26th, 2018 by Saurenergy The Minister asked officials to utilise hydro and solar power facilities to avoid load-shedding. On the other hand Kumaraswamy held the central government responsible for the power crisis. Karnataka Chief Minister H D Kumaraswamy after reports of a looming power crisis has directed the concerned officials to ensure there was no interruption in power supply in […] Read more