Indian Railways to Reduce Emission by 33 Percent by 2030 Updated On Mon, Jun 5th, 2017 by Saurenergy The use of renewable sources of energy will be promoted for which a big target has been set to achieve 1000 MW of solar power installed capacities. Going green, the Indian Railways is stepping up efforts to reduce emission by 33 percent in the next 10-12 years through sustained energy efficiency measures and maximum use […] Read more
Amara Raja, Juwi India, Luminous Power and 68 other de-empaneled by MNRE Updated On Thu, Jun 1st, 2017 by Saurenergy MNRE stated the empanelment of these de-empaneled channel partners will not be considered for next one year. The Ministry of New and Renewable Energy on Wednesday announced that it has de-empanelled 71 channel partners/ new entrepreneurs including Juwi India Renewable Energies Private Limited, Amara Raja Electronics Limited and Luminous Power. These channel partners has been […] Read more
CHANCES & CHALLENGES RELATED TO EPC Updated On Sat, May 27th, 2017 by Saurenergy As the world moves towards the sustainable development, India looks to optimize its energy mix with minimum carbon footprints. India is in the midst of a momentous leap in terms of the proposed use of solar power as part of its overall renewable energy mix. India with its 100GW of solar energy target by 2022 is […] Read more
Secret to Hit 40GW Updated On Sat, Apr 29th, 2017 by Saurenergy Government of India has rightly made rooftop solar power one of its top clean energy priorities. In 2014, the government revised the national solar installation target from 22 GW to an aggressive 100 GW by 2022 which is helping the country to become one of the world’s fastest-growing solar markets. The 100 GW target was […] Read more
REPORT ON THE 11TH SNEC PV POWER EXPO Updated On Sat, Apr 29th, 2017 by Saurenergy SNEC2017, with the exhibiting space reaching 180,000 square meters, attracted over 1,800 exhibitors and over 220,000 visits from 95 countries and regions The 11th SNEC PV POWER EXPO Successfully Held The largest PV tradeshow in the world — SNEC 11th (2017) International Photovoltaic Power Generation Conference & Exhibition was successfully rounded off on April 21st, 2017. […] Read more
Manufacturing Units without Electricity Grid Connections Now a Reality Updated On Fri, Apr 28th, 2017 by Saurenergy Consul Neowatt has made setting up manufacturing facilities without electricity grid connections is now a reality. Consul Neowatt, the Global Indian UPS Company and manufacturers of Sunbird solar inverters, the preferred choice of system integrators in India, has announced that setting up manufacturing facilities without electricity grid connections is now a reality. It has successfully […] Read more
Ingot Carving the Future Updated On Mon, Apr 24th, 2017 by Saurenergy Silicon is the most abundant solid element on earth; it makes up more than 25% of the earth’s crust. However, it rarely occurs in elemental form, virtually all of it is existing as compounds. Solar cells are made from silicon boules, polycrystalline structures that have the atomic structure of a single crystal. The most commonly […] Read more
PROINSO announces a new R&D and Training facility in Mumbai and increasing manufacturing exports Updated On Sat, Apr 22nd, 2017 by Saurenergy PROINSO is giving its own contribution towards realizing the Indian Prime Minister’s ‘Make in India’ concept Solar energy supply company, PROINSO continues to consolidate its 6 year presence in India by announcing a new R&D and Training facility in Mumbai and increasing manufacturing exports. The company’s firm commitment to India is reflected in the company’s growing presence in the […] Read more
Utility Scale O&M Practices Updated On Thu, Apr 20th, 2017 by Saurenergy India has been moving ahead aggressively with an ambitious programme to reach an installed capacity of 100GW solar power by 2022. Many states are setting up Multi-megawatt solar power installations to herald the arrival of the renewable energy generation. Solar Power Plants are built to last 25 years or more. However, after the Engineering Procurement […] Read more