43 Pumped Hydro Storage Projects With 55 GW Capacity Under Survey: Govt Updated On Wed, Dec 27th, 2023 by Saurenergy Union Power Minister R.K Singh in a written reply before the Parliament stated that a total of 43 Pumped Hydro Storage Projects (PSPs) are under survey and investigation in the country. He mentioned that these projects have an aggregate installed capacity of 55,085 MW. The minister also said that a total of four PSPs are […] Read more
Engineer- Development IV Updated On Tue, Dec 26th, 2023 by Saurenergy Perform material and device research to enhance thin film solar cell performance and stability and to reduce manufacturing cost. Responsible for projects or functions that are highly complex, require significant innovation and critical to department objectives. Plan, execute and characterize development engineering experiments in the laboratory and manufacturing environment with strategic foresight. Success requires iterative […] Read more
Inox Wind Bags Repeat Order For 279 MW For Its 3 MW Wind Turbines Updated On Tue, Dec 26th, 2023 by Saurenergy Indian wind energy solutions company Inox Wind has bagged an order for 279 MW from a large Commercial and Industrial (C&I) player. The order is for Inox’s latest 3 MW Wind Turbine Generators (WTGs), and the scope comprises a mix of equipment supply with limited scope EPC for 180 MW and end-to-end turnkey execution for […] Read more
Adani Green Concludes PPA For Entire 8GW Manufacturing-Linked SECI Tender Updated On Mon, Dec 25th, 2023 by Saurenergy Adani Green Energy Ltd (AGEL) has announced the execution of power purchase agreement (PPA) with the Solar Energy Corporation of India (SECI) to supply 1,799 MW of solar power. With the signing of this balance PPA, AGEL has completed the power offtake tie-up for the entire 8,000 MW manufacturing-linked solar tender awarded to it by […] Read more
CERC Grants Compensation To Azure Power Over ‘Change of Law’ Events Updated On Fri, Dec 22nd, 2023 by Saurenergy In its latest judgment, the Central Electricity Regulatory Commission (CERC) allowed Azure Power compensation for ‘change of law’ events. These events were related to the Goods and Service Tax (GST) surge on solar products. The detailed order said that the case was related to three projects of Azure. This includes two 300 MW solar plants, each situated […] Read more
RenewSys Launches POE Encapsulant Tailormade for n-type TOPCon Updated On Fri, Dec 22nd, 2023 by Saurenergy Indian Solar Module Manufacturer RenewSys claimed to introduce India’s first POE (Polyolefin Elastomer) Encapsulant specifically formulated for N-type TOPCon PV cells. The firm has named it CONSERV E – NT. The renewable company said that the product will help in reducing the degradation of the n-type TOPCon solar cells. “The solar PV market is constantly […] Read more
Saudi’s ACWA Power in PPA with South Africa for Dispatchable RE Project of 150 MW Updated On Wed, Dec 20th, 2023 by Saurenergy Saudi-based clean energy firm ACWA Power, has entered into a Power Purchase Agreement (PPA) for a project known as, ‘ACWA Power Project DAO’ to be established in South Africa. The initiative is for a dispatchable renewable hybrid plant of 150 MW capacity. The signatories of the agreements included Gwede Mantashe, Minister of Mineral Resources and […] Read more
MERC Rejects MEDA’s Plea For 50% Local RE Procurement By Discoms Updated On Tue, Dec 19th, 2023 by Saurenergy The Maharashtra Energy Development Agency had filed a petition with the Maharashtra Electricity Regulatory Commission (MERC) asking it to issue appropriate directions to distribution licensees (discoms) to meet 50% of total Renewable Purchase Obligation (RPO) requirement by purchase of energy from Renewable Sources within the State. Maharashtra has achieved installed capacity of 10,799 MW as […] Read more
Applications Engineer – PV Integration Updated On Wed, Dec 13th, 2023 by Saurenergy Manage Form-Fit Function tests accordingly (including data collection and report generating) Manage loading tests of various PV module / tracker product combinations as required (including data collection and report generating) Travel to PV module manufacturers and 3rd party testing facilities as required Module related document (Test guide/3rd party report) and test tracking sheet (loading test […] Read more