Solar Cell Manufacturing: Gujarat To Take The Lead, Odisha New Entrant Updated On Fri, Nov 29th, 2024 by Saurenergy India is on the cusp of a major transformation in solar cell production, and Gujarat is set to take the lead in solar cell manufacturing. With the country’s solar manufacturing sector rapidly expanding, the majority of announced and existing solar cell plants are concentrated in Gujarat, though emerging states like Odisha and Tamil Nadu are […] Read more
Waaaree Energies Plans To Start Solar Cell Manufacturing From Dec Updated On Fri, Nov 29th, 2024 by Saurenergy Waaree Energies, a Mumbai-based solar manufacturing company, has set mid-December as the deadline for commissioning its solar cell production facility. The company stated that work is in its final stages to begin operations at its Chikhli plant in Gujarat, where it had earlier invested in setting up the cell line. During the latest investors’ call, […] Read more
Brazil Installed Solar Capacity Touches 50 GW In 2024 Updated On Thu, Nov 28th, 2024 by Saurenergy Brazil’s solar installed capacity recently reached 50 GW according to new data from the Brazilian Photovoltaic Solar Energy Association (ABSOLAR). Of the cumulative capacity, the country secured 33.5 GW from distributed generation and 16.5 GW from utility-scale projects, The country now sources more than 95% of the capacity released this year from renewable sources. With […] Read more
COVER STORY: India Eyes Historic Rise Of Solar Cell Manufacturers Updated On Thu, Nov 28th, 2024 by Saurenergy So far, 2024 has been a remarkable year for the Indian solar industry. Not only has it met expectations so far in terms of capacity additions, it has also delivered a huge fillip to the rooftop solar sector, thanks to PM Surya Ghar and new momentum in promising schemes like PM-KUSUM, besides record additions in […] Read more
NTPC, Chhattisgarh Genco To Build 2 GW Renewable Energy Projects Updated On Wed, Nov 27th, 2024 by Saurenergy NTPC recently signed a Memorandum of Understanding (MoU) with Chhattisgarh State Power Generation Co. Ltd. (CSPGCL) to develop up to 2 GW of renewable energy projects, including floating solar projects. To initiate the creation of this project, Chief Engineer (CP & BD) of CSPGCL, G. K. Gupta, and General Manager (Engineering) of NGEL, D. Joshi, […] Read more
Top 5: Largest Solar Projects in the Middle East Region Updated On Wed, Nov 27th, 2024 by Saurenergy The Middle East region is making strides in renewable energy growth as global development increasingly moves away from conventional sources of energy. Renewable energy sources, such as solar, wind, and green hydrogen, have become the new engines powering growth and development. Some of the major oil-producing countries, like the UAE and Saudi Arabia, are now […] Read more
Telangana Issues Tender For 1 GW Of Rooftop Solar Projects Updated On Tue, Nov 26th, 2024 by Saurenergy The Telangana State Renewable Energy Development Corporation Limited (TSREDCO) has now issued a tender for rooftop solar projects. Through this tender, the state has planned to add 1 GW of new rooftop solar capacity. The move comes as the state plays catch up on renewable capacity, considering the limited options to add large, utility scale […] Read more
THDC Issues Tender To Develop DPR For Floating Solar In Eight States Updated On Tue, Nov 26th, 2024 by Saurenergy The Tehri Hydro Development Corporation Limited (THDC India) has now planned to boost floating solar projects. It has issued a tender seeking bids to prepare Detailed Project Reports (DPRs) in this regard. These projects will be located in eight states. These include-Uttarakhand, Uttar Pradesh, Chhattisgarh, Madhya Pradesh, Karnataka, Kerala, Rajasthan, and Maharashtra. The last date […] Read more
Waaree Energies Bags 600 MW Solar Module Order Updated On Tue, Nov 26th, 2024 by Saurenergy Waaree Energies, the module manufacturing arm of the Waaree Group today announced bagging a 600 MW solar module order. The company in its filing before the exchanges informed its investors about the new order. The delivery of these modules is scheduled to begin in FY 2025-26, the firm said. This contract involves the supply of […] Read more