Tata Power Commissions 300 MW Solar plant in Dholera Updated On Mon, Apr 4th, 2022 by Saurenergy Tata Power Renewables Energy Ltd (TPREL), a wholly-owned subsidiary of Tata Power has commissioned a 300 MW project in Dholera, Gujarat. It is India’s largest single-axis solar tracker system. The project will generate 774 MUs annually. The installation entails 873012 nos. of Monocrystalline PV Modules. The project was commissioned well within the stipulated timeline, according […] Read more
Haryana invites bids for setting up 4.7 MW solar power plants Updated On Mon, Apr 4th, 2022 by Saurenergy Two new tenders have been issued to seek applications for the development of solar power plants, totalling 4.7 MW capacity, at various locations in Haryana. The tender documents can be accessed here. Tender 1: Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) has invited bids from interested farmers, panchayats, co-operatives, farmer producer organizations (FPO), and water […] Read more
Himachal Government Hikes State Subsidy to Rs 6,000/kW for Rooftop Solar Updated On Mon, Apr 4th, 2022 by Saurenergy The state government of Himachal Pradesh has proposed to increase the subsidy for grid connected rooftop solar power installations in the state. The move is aimed to encourage the domestic players and households to adopt and install solar power systems. HIMURJA said that the subsidy will be increased from Rs 4,000 for every kilowatt to […] Read more
Kochi Metro gets 51% of its Power Supply from Solar Installations Updated On Fri, Apr 1st, 2022 by Saurenergy Kochi Metro Rail Ltd (KMPL) has commissioned a 1.8 MW solar power plant at its coach depot in Muttom. Post commissioning, Kochi Metro has announced that the power is helping the metro operator to meet 51% of its total power requirements from solar energy. Fallow land near the Muttom depot has been utilized for solar […] Read more
Low demand for grid-connected rooftop solar systems in Kerala Updated On Fri, Apr 1st, 2022 by Saurenergy Kerala, the most literate state in the country with a high proportion of urban, independent housing, is failing the rooftop solar test. Grid-connected rooftop solar power systems, one of the key projects identified to meet the state’s solar target, is failing to attract many users. This, even as the state discovered fairly competitive prices for […] Read more
SJVN incorporates new arm for clean energy business Updated On Fri, Apr 1st, 2022 by Saurenergy State-owned Satluj Jal Vidyut Nigam (SJVN) on Thursday said it has incorporated a new subsidiary for executing renewable projects. The new subsidiary, SJVN Green Energy Ltd (SGEL), shall work in the verticals of power generation from renewable sources such as solar parks, wind & hybrid projects, battery energy storage system, assets creation in wave, biomass, […] Read more
NTPC generated record 360 BU of energy during FY21-22 Updated On Fri, Apr 1st, 2022 by Saurenergy NTPC, India’s largest integrated power generating company, has reported the highest-ever annual group generation of 360 BU (billion units) during FY2021-22, a growth of 14.6% compared to the previous year. During this period, NTPC states, the company also recorded the highest-ever single day generation of 1215.68 MU (Group) & 1013.45 MU (NTPC). The coal-based plants […] Read more
How are national oil companies tackling energy transition: Woodmac Updated On Thu, Mar 31st, 2022 by Saurenergy Despite their scale, national oil companies (NOCs) have until now largely escaped the heavy scrutiny experienced by international oil companies (IOCs) around emissions. Partly as a consequence, the energy transition strategies of most NOCs significantly lag those of their leading IOC peers, says Wood Mackenzie. NOCs account for more than half of global oil and […] Read more
Karnataka Renewable Energy Policy Approved By State Cabinet Updated On Thu, Mar 31st, 2022 by Saurenergy The Cabinet of the State Government of Karnataka has cleared the Karnataka Renewable Energy Policy for the period of 2022-2027, that seeks to maintain the state’s reputation as a renewable energy leader. The policy says that in the next five years, Karnataka will have a renewable power generation capacity of 10 GW. The policy wants […] Read more