Assam Issues Tender for 70 MW Solar Project in Amguri Solar Park Updated On Mon, Jan 14th, 2019 by Saurenergy APGCL has fixed the upper ceiling for quoted tariff at Rs 3.50/kWh The Assam Power Generation Corporation Limited (APGCL) has issued a tender inviting Request for Proposal (RFP) from interested power producing companies/solar developers for the allotment of 70 MW of Grid-Connected ground-mounted solar photovoltaic projects to be implemented in Amguri Solar Park in the state […] Read more
MNRE Issues Tender for Ignitability Test Facilities for Solar Module at NISE Updated On Mon, Jan 14th, 2019 by Saurenergy The last date of bid submissions is 25th February 2019 and the technical bids will open on the same date. The National Institute of Solar Energy (NISE), an autonomous institute under the Ministry of New and Renewable Energy (MNRE), has invited tenders in two parts (Technical and Commercial) for setting up of Ignitability tests facilities […] Read more
Chhattisgarh Issues Terms & Condition for Distributed Solar Projects Updated On Thu, Jan 10th, 2019 by Saurenergy If a project installed at consumer’s premises delivers excess electricity to the DISCOM, the DISCOM will procure such excess energy generated at the end of the settlement period at the rate of Rs 1/kWh. The Chhattisgarh State Electricity Regulatory Commission (CSERC) has issued its CSERC Regulation 2019 (terms and conditions for distributed solar projects in the […] Read more
Amendments to Guidelines for Tariff Based Bidding on Solar Projects Updated On Thu, Jan 10th, 2019 by Saurenergy MNRE has made amendments to the guidelines for the bidding process of solar photovoltaic projects. Issuing changes in the bid submission deadline, the period of financial closure and commissioning period The Ministry of New and Renewable Energy (MNRE) has issued a notification with amendments to the guidelines for the tariff-based competitive bidding process for […] Read more
List of BIS Standards Applicable for Components of Solar PV Applications Issued Updated On Tue, Jan 8th, 2019 by Saurenergy The list includes six products along with Indian Standard Number and the Title of Indian Standard. The Ministry of New and Renewable Energy (MNRE) has also issued the list of BIS standards applicable for components of solar PV applications. The list includes six products along with Indian Standard Number and the Title of Indian Standard. […] Read more
MNRE Issues Technical Specifications for 12 W White-LED based Solar Street Lighting System Updated On Tue, Jan 8th, 2019 by Saurenergy The government said in a notification that, indigenously manufactured PV module should be used in the system. The Ministry of New and Renewable Energy (MNRE) has issued technical specifications for 12 W White-LED based solar street lighting system. The government said in a notification that, indigenously manufactured PV module should be used in the system. […] Read more
MNRE Extends BIS Certification Deadline for Solar Inverters till June 30, 2019 Updated On Tue, Jan 8th, 2019 by Saurenergy It further added that, “These manufacturers will be allowed self-certification without submitting samples to test labs as the series guidelines for submitting samples to test labs are under preparation.” In a bid to provide relief to the industry, the Ministry of New and Renewable Energy (MNRE) has further extended the deadline for the Bureau of […] Read more
SECI Issues RfS for 1200 MW Wind-Solar Hybrid Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The maximum tariff payable to each WPD is fixed at Rs 2.85/kWh for the entire term of 25 years. State-owned Solar Energy Corporation of India (SECI) has issued Request for Selection (RfS) document for setting up of 1200 MW ISTS connected wind power projects (Tranche-VI) on “Build Own Operate” basis. This 1200MW solar-wind hybrid tender […] Read more
NIT for Setting-Up 1.2GW ISTS Connected Solar PV Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The detailed Request for Selection (RfS) document will be available for downloading from January 14, 2019 onwards. The Solar Energy Corporation of India (SECI) has invited online bids for the setting up of 1200 MW ISTS connected solar PV power projects (ISTS-III). However, the detailed Request for Selection (RfS) document will be available for downloading from January […] Read more