Squadron Energy Begins Building 14GW Wind Farm Expected to Power 2 Million Homes In Australia Updated On Fri, Jan 19th, 2024 by Saurenergy The construction of the largest wind farm in Australia’s New South Wales is currently underway. Upon completion, the project is expected to generate 14GW of green electricity which will be sufficient to power six million homes. The wind farm is being built by Squadron Energy, a renewable energy company in Australia, wholly owned by Tattarang. […] Read more
IREDA Signs MoU with IOB For Co-lending For Renewable Energy Projects Updated On Thu, Jan 18th, 2024 by Saurenergy Indian Renewable Energy Development Agency Ltd. (IREDA), a non-banking financial institution under the Ministry of New and Renewable Energy (MNRE), has signed a Memorandum of Understanding (MoU) with Indian Overseas Bank (IOB) pertaining to co-lending and loan syndication for a diverse spectrum of renewable energy projects across the country. The MoU includes provisions for co-lending […] Read more
Battery Usage In Transport, Power Can Abate 60% Energy Needs: Report Updated On Thu, Jan 18th, 2024 by Saurenergy A recent report by Rock Mountain Institute (RMI) found that increase usage of battery in transportation can reduce fossil fuel requirements up to half. The report found, “Demand is growing on an S-curve. Battery sales have been doubling every two to three years, and we are on track for a six to eight times increase […] Read more
Sun Trinity Established 15,000 Kw Solar Carport At AEON Mall Updated On Tue, Jan 16th, 2024 by Saurenergy A recent announcement was made by Sumitomo Corporation company, Sun Trinity to install a carport-type solar power generation equipment of 15,000 kilowatts at AEON Mall This installation at the AEON Mall by Sun Trinity, has a total capacity of approximately 15,000 kilowatts and it claims to be the largest in Japan in the outdoor parking […] Read more
5 Ways Lower Storage Costs Will Affect Solar Deployment Updated On Tue, Jan 16th, 2024 by Saurenergy Ever since 2015, when solar started being added at scale every year, all stakeholders have known the biggest challenge it will ultimately face. Intermittency. Or more simply, what to do when the sun goes down. That is why cheap and efficient storage has been considered almost like the golden key that will unlock solar possibilities […] Read more
Growatt Powers Commercial Solar Installation in Gujarat Updated On Mon, Jan 15th, 2024 by Saurenergy Solar inverter company Growatt unveiled a 735 kW solar project in India. This project forms a part in the renewable energy blueprint of Supreme Industries, India’s largest plastic production and processing company. Commissioned in collaboration with the installer Kalpa Power and powered by Growatt’s MAX and MAC series inverters, this project ensures peak performance, safety, […] Read more
36 Municipal Schools in Mira Bhayandar to be solarised by MBMC Updated On Mon, Jan 15th, 2024 by Saurenergy The Mira Bhayandar Municipal Corporation (MBMC), Thane, is taking significant steps to enhance energy efficiency by initiating the installation of rooftop solar plants across all municipal schools in the twin-city. Currently, there are 17 structures accommodating 36 municipal schools run by MBMC. The estimated cost of the solar power project is Rs. 50 lakh, with […] Read more
Smart Cities, Bright Futures: Solar Integration in Urban Planning Updated On Fri, Jan 12th, 2024 by Saurenergy As India undergoes rapid urbanization, the imperative for sustainable and smart city solutions has never been more pronounced. With a burgeoning population and increasing energy demands, the integration of solar power into urban planning emerges as a beacon of hope for a greener and more sustainable future. In this article, we delve into the latest […] Read more
CERC Awards Compensation To Indigrid Solar Over Change In GST Rates Updated On Fri, Jan 12th, 2024 by Saurenergy In its latest judgment, the Central Electricity Regulatory Commission (CERC) granted compensation to Indigrid Solar-I (AP) Pvt Ltd. over escalated GST rates. The firm approached the Central Commission seeking compensation, citing increased project costs due to introducing GST on solar products. The solar power generator, in its petition, told the CERC that after the firm submitted […] Read more