MNRE Issues Benchmark Costs for Rooftop Solar PV Systems for FY22 Updated On Fri, Aug 20th, 2021 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued a notification with the latest benchmark costs for the installation of new grid-connected rooftop solar PV systems for the present financial year i.e. 2021-22 (FY22). Benchmark costs for FY22 for general category states/UTs are as follows: Benchmark costs for Special Category States/UTs (i.e. North-Eastern States including Sikkim, Himachal […] Read more
Vistra, LG Energy Expand Californian Battery Facility to 1.6 GWh Updated On Fri, Aug 20th, 2021 by Saurenergy Vistra Corp., a Texas-based energy firm, and LG Energy Solution, a South Korean battery maker, have completed setting up the 400 MW/1.6 GWh Vistra Moss Landing Energy Storage Facility in Monterey County, California. Vistra recently finished construction on Phase II of the facility. The battery system is now storing power and releasing it to California’s grid […] Read more
Why So Slow? JP Morgan Energy Paper Seeks To Answer The Question Updated On Thu, Aug 19th, 2021 by Saurenergy The asset and wealth management arm of JP Morgan Chase & Co. Has released its annual energy paper, “Eye on the Market,” which examines current trends on the ground every year as the fourth great energy transition unfolds. The 11th edition of this paper zero’s in on one question: Why is the transition taking so […] Read more
Will Concentrated Solar Power be Reborn? Report Says Yes Updated On Thu, Aug 19th, 2021 by Saurenergy Concentrated Solar Power (CSP), which has lain moribund for a decade, is about to be reborn, according to a new report from Rethink Technology Research, with global capacity to increase several times over by 2030. The study expects CSP to claim its place serving power grids, green hydrogen complexes, and industrial process heat in California, […] Read more
Scientists Make Bifacial Solar Cell with Record Power Output at 29% Updated On Thu, Aug 19th, 2021 by Saurenergy A team of scientists at the Australian National University (ANU) have used laser processing to produce a record-breaking bifacial solar cell with a front conversion efficiency of 24.3% and a rear conversion efficiency of 23.4%, representing a bifacial factor of 96.3%. This performance represents an effective power output of approximately 29%, well exceeding the performance of the […] Read more
Maharashtra Renewable Plans Back On Track, Powered By Lower Costs Updated On Thu, Aug 19th, 2021 by Saurenergy 2021 has been a good year so far, for renewable energy growth in Maharashtra, with the primary state discom, Maharashtra State Electricity Distribution Company Limited (MSEDCL) finally happy with the bids it received for its recent tenders. With prices dropping to as low as Rs 2.42 for its last solar tender, besides Rs 2.62 for […] Read more
4 Days to Aug 22 Deadline for Feedback on Rooftop Solar Guidelines Updated On Wed, Aug 18th, 2021 by Saurenergy The revised deadline for feedback on rooftop solar systems is August 22. The MNRE has shared a detailed feedback document for stakeholders to share their feedback. As readers are aware, India has performed quite poorly on its rooftop solar segment. From a target of 40 GW out of the 100 GW of solar capacity that […] Read more
US Distributed Energy Major Nexamp Closes $680 million Fund Raise Updated On Wed, Aug 18th, 2021 by Saurenergy Nexamp, which has a focus on distributed solar and storage systems, has secured a $240 million equity investment led by Generate Capital. The company also recently raised $440 million in debt financing, bringing its total new funding to $680 million. The new funding will accelerate Nexamp’s ability to offer a flexible range of decarbonization options for customers, expanding its […] Read more
California Goes With Rule for Solar and Battery Storage on New Buildings Updated On Tue, Aug 17th, 2021 by Saurenergy The California Energy Commission (CEC) has adopted the 2022 Building Energy Efficiency Standards (Energy Code) for newly constructed and renovated buildings that say the new buildings need to be equipped with solar and battery storage for clean energy goals. As the state’s primary energy policy and planning agency, the CEC adopts standards every three years […] Read more